Performance and Guarantee Test definition

Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.
Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristic as
Performance and Guarantee Test. , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristic asspecified in the contract documents.

Examples of Performance and Guarantee Test in a sentence

  • The equipment/materials must carry a guarantee against faulty materials, faulty design, defective and bad workmanship for a period of 12 months from the date of Performance and Guarantee Test or 24 months from the date of receipt of last consignment at site store whichever is earlier.

  • The equipment/ materials /materials must carry a guarantee against faulty materials, faulty design, defective and bad workmanship for a period of 12 months from the date of Performance and Guarantee Test or 24 months from the date of receipt of last consignment at site store whichever is earlier.

  • Commissioning Check Tests/ Performance and Guarantee Test: In addition to the checks and test recommended by the manufacturer, the contractor shall supervise the following acceptance tests to be carried out on each set.

  • For Schedule items at Sr. No. 1 to 29 in Section-6 of the Tender document, GST, as admissible shall be paid only on submission of proof of depositing the same to the concerned Govt.

  • In such case, Performance and Guarantee Test shall be repeated within one month from the date of equipment is ready for re-test and all cost for modifications including labor, materials and the cost of additional testing to prove that the equipment meets the guarantee, shall be borne by the Contractor.

  • The Formal Test Report with regard to SHR which was agreed to be submitted by BHEL, after conducting the Performance and Guarantee Test is not yet furnished to KSEBL.

  • Any special equipment, tools and tackles required for the successful completion of the Performance and Guarantee Test shall be provided by the Contractor, free of cost.

  • The equipment/materials must carry a guarantee against faulty materials, faulty design, defective and bad workmanship for a period of 12 months from the date of Performance and Guarantee Test or 24 months from the date of receipt of last consignment at site store.

  • The equipment/materials must carry a guarantee against faulty materials, faulty design, defective and bad workmanship for a period of 12 months from the date of Performance and Guarantee Test.


More Definitions of Performance and Guarantee Test

Performance and Guarantee Test means all operational checks and testsrequired to determine and demonstrate capacity, efficiency and operatingcharacteristics as specified in the Contract Documents.
Performance and Guarantee Test means all operational checks and tests required to determine and dem onstrate capacity, efficiency, and oper ating characteristics as specified in the contract documents.

Related to Performance and Guarantee Test

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Performance Standards or “PS” shall mean the cleanup levels and other measures of achievement of the remedial action objectives, as set forth in the ROD.

  • Performance Guarantee means the security to be provided by the Contractor in accordance with Sub Clause 10.1 for the due performance of the Contract.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Annual performance report means a written appraisal of the teaching staff member's performance prepared by the teaching staff member’s designated supervisor based on the evaluation rubric for his or her position.