Operating Unit means, for purposes of this part, primary and constituent operating units designated as such in the Department Order Series of the De- partment of Commerce and, in addi- tion, the Office of the Secretary.
Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.
Planned unit development means a subdivision characterized by a unified site design, clustered residential units and/or commercial units, and areas of common open space.
Business Unit means the assets constituting the business or a division or operating unit thereof of any Person.
Management Area means the land and waters to which this Act applies by operation of section 4, and includes any land the subject of an agreement under section 11(1)(a);
Operations Plan means the document by which PURCHASER notifies STATE of the plans and schedule for completing the operations described in the contract. It also contains the names of the subcontractors, PURCHASER's Authorized Representatives, and STATE's Authorized Representatives. Permit means any permit required by a federal, state, or local government agency before operations under this contract may lawfully begin or continue. Permit includes an incidental take permit under the federal Endangered Species Act.
Generation Operations Center means the location of Buyer’s real-time operations personnel.
Project Management Unit or “PMU” means the Recipient’s management and Implementation unit referred to in Section I.A.2 of Schedule 2 to this Agreement.
Development Area means that area to which a development plan is applicable.
Nonattainment area means an area so designated by the administrator, acting pursuant to Section 107 of the Act.
Unit and “Quality” means the unit and quantity specified in the schedule.
Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
Common interest development means any of the following:
Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.
Petroleum Operations means, as the context may require, Exploration Operations, Development Operations or Production Operations or any combination of two or more of such operations, including construction, operation and maintenance of all necessary facilities, plugging and abandonment of Xxxxx, safety, environmental protection, transportation, storage, sale or disposition of Petroleum to the Delivery Point, Site Restoration and any or all other incidental operations or activities as may be necessary.
Emissions unit means any part or activity of a stationary source that emits or has the potential to emit any regulated air pollutant or any pollutant listed under Section 7412(b) of the FCAA. This term is not meant to alter or affect the definition of the term "unit" for purposes of Title IV of the FCAA.
Drilling unit means the area fixed for the drilling of one well by order or rule of any state or federal body having authority. If a Drilling Unit is not fixed by any such rule or order, a Drilling Unit shall be the drilling unit as established by the pattern of drilling in the Contract Area unless fixed by express agreement of the Drilling Parties.
Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.
Cogeneration unit means a unit that is able to operate in cogeneration mode;
STP means the temperature of fifteen degrees Celsius (15°C) and at a pressure of one hundred and one decimal three two five kilopascals (101.325 kPa).
Exploration Operations means operations conducted in the Contract Area pursuant to this Contract in searching for Petroleum and in the course of an Appraisal Programme and shall include but not be limited to aerial, geological, geophysical, geochemical, palaeontological, palynological, topographical and seismic surveys, analysis, studies and their interpretation, investigations relating to the subsurface geology including structural test drilling, stratigraphic test drilling, drilling of Exploration Xxxxx and Appraisal Xxxxx and other related activities such as surveying, drill site preparation and all work necessarily connected therewith that is conducted in connection with Petroleum exploration.
Project Services means architectural, engineering services, land surveying, construction management at-risk services, ancillary technical services or other construction-related services determined by the board to be required by the project.
Planned development means a real property development other than a community apartment project, a condominium project, or a stock cooperative, having either or both of the following features:
Drilling operations means the drilling of an oil and gas well and the production and completion operations ensuing from the drilling which require entry upon the surface estate and which were commenced after June 30, 1979, and oil and gas geophysical and seismograph exploration activities commenced after June 30, 1983.