Operational Testing definition

Operational Testing means a period, lasting up to two years under the construction permit, of full-scale injection operation for the purposes of long term testing, to determine potential fluid migration prior to issuing the operational permit.
Operational Testing has the meaning given in Paragraph 4.5 of the Transition Schedule. Term Acronym Definition
Operational Testing means a testing period following the completion of the construction of a system, its components and connections. “Operational testing” begins with operation or load simulation for the purpose of testing machinery, equipment and other “covered property”. “Operational testing” ends when the property has successfully completed such testing.

Examples of Operational Testing in a sentence

  • Operational Testing – Testing conducted to evaluate a system in its operational environment.

  • The Contractor shall support all facets of Developmental and Operational Testing (OT).

  • The PTSU System shall be ready for Operational Testing on or before the Substantial Completion Date.

  • Operational Testing is performed by the SSMs and the A/B and DME MACs. Performance Testing – Testing that applies heavy transaction and processing loads to the system to ensure that response times, throughput rates, and processing windows remain acceptable and can accommodate production workloads.

  • Assist the Test Engineer in organizing and management of Initial Developmental and Operational Testing, Shock Plan and other special testing events.

  • Provide support for the TEP, Live Fire Test and Evaluation (LFT&E), Developmental Testing (DT), Operational Testing (OT), Research and Design (R&D) programs and other projects; and conduct and support survivability design reviews and assessments for ship-system acquisition programs, life-cycle managers and fleet commands.

  • There will be an Operational Testing Group (OTG) constituted by a Department comprising of NIC technical consultants and users of all levels from different stakeholder institutions to perform User Acceptance Testing (UAT).

  • The PM ensures the Chief Developmental Tester or Test Manager establishes an Integrated Test Team after Materiel Development Decision, develops and documents test planning and the level of test support required for the life cycle of the system, and conducts readiness reviews in accordance with AFI 99-103 and AFMAN 63-119, Certification of Systems Readiness for Dedicated Operational Testing.

  • Assist the Test Engineer in organizing and management of Developmental and Operational Testing, Shock Plan and other special testing events.

  • Operational Testing Program WideSummarize how the program will test the supplies and services covered by the AP to ensure that they work when provided to the end user.


More Definitions of Operational Testing

Operational Testing means a testing period following the completion of the construction of a
Operational Testing means Testing during the Operational Phase;"Operational User"means any member of the Service Provider Personnel or TfL Personnel using the Service Systems; "Operational Year"means a period of 12 months starting from the Operational Commencement Date or an anniversary of such date (as the case may be), and "Operational Year 1", "Operational Year 2" and so on shall be interpreted accordingly; "Other Service Provider"means any party providing services to, or having an interface with, TfL in relation to the Schemes from time to time other than the Service Provider and any Sub-Contractor including, without limitation, any provider to TfL of a Vehicle Data Service (including, if relevant, the DVLA and equivalent overseas vehicle licensing authorities), the County Court, the Parking and Traffic Appeals Service, the Metropolitan Police, any debt recovery agencies, Bailiffs, any communications providers (if relevant, from time to time), the Detection and Enforcement Infrastructure Service Provider, HSBC Bank plc, the Merchant Acquirer, VOSA, the Landlord of the TfL Premises and any replacement supplier performing services similar to the services provided under the EOps Services Agreement (if that agreement is terminated in whole or in part);"Other Service Provider Systems" or "Other Systems"means all or any part of any Systems, Hardware or Software used by and/or provided by or on behalf of any Other Service Provider in connection with the Scheme;"Other Solution Element" means the EOps Systems; "Overhead Charge"means a monthly charge calculated in accordance with paragraph 3.1(D) of Schedule 7 (Charging & Operational Pricing); "Paper Free Environment"means a work environment in which the use of paper and pens is prohibited and all business processes and procedures are conducted electronically, except where necessary for Communications required pursuant to this Agreement or where expressly agreed by TfL in writing; "Parameter "means any defining factor within the Service System(s) that determines (or limits) its performance, which can be added to or changed by Authorised User and is not hard-coded. "Parameterised" shall be construed accordingly;"Parameter Change"means a change to a Parameter;"Parameter List"has the meaning given to it in section 21 of Annex A of Schedule 3 (Milestones and Deliverables);"Parent Company"mean, in relation to an undertaking, a parent undertaking of that first undertaking as defined in Section 1162 of the Companies Act 2006; "Partial Ter...
Operational Testing means that testing designed to verify that the EDI Service executes its functionality as defined in the project Work Plans.

Related to Operational Testing

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Cannabis testing facility means an entity registered by

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Supplier Operations means all assets, processes and systems (including information systems), data (including Customer data), personnel, and sites, used or processed by Supplier from time to time in the performance of this Agreement.

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Generation Operations Center means the location of Buyer’s real-time operations personnel.

  • ASAM criteria means the most current edition of the American Society of Addiction Medicine's published criteria for admission to treatment, continued services, and discharge.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.