Open water fill permit definition

Open water fill permit means the type of New Jersey Pollution Discharge Elimination System permit issued pursuant to this chapter and N.J.S.A. 58:10A-1 et seq., which governs the discharge of dredged or fill material into State open waters.

Related to Open water fill permit

  • Title V operating permit means a permit issued under Chapter 3745-77 of the Administrative Code.

  • National Pollutant Discharge Elimination System Permit or “NPDES” means a permit issued by the MPCA as required by federal law for the purpose of regulating the discharge of pollutants from point sources into waters of the United States from concentrated animal feeding operations (CAFOs) as defined by federal law

  • Submerged fill pipe means any fill pipe with the discharge opening entirely submerged when the liquid level is six inches above the bottom of the tank; or when applied to a tank which is loaded from the side, shall mean any fill pipe with the discharge opening entirely submerged when the liquid level is eighteen inches above the bottom of the tank.

  • Final permit means the version of a permit issued by the Department that has completed all review procedures required by Chapter 14, and for a Class I permit, Chapter 13.

  • Title V Permit means an operating permit under Title V of the Act.

  • Solid film lubricant means a very thin coating consisting of a binder system containing as its chief pigment material one or more of molybdenum disulfide, graphite, polytetrafluoroethylene (PTFE) or other solids that act as a dry lubricant between faying surfaces.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Environmental Permit means any permit, approval, identification number, license or other authorization required under any Environmental Law.

  • Channel migration zone (CMZ) means the area where the active channel of a stream is prone to move and this results in a potential near-term loss of riparian function and associated habitat adjacent to the stream, except as modified by a permanent levee or dike. For this purpose, near-term means the time scale required to grow a mature forest. (See board manual section 2 for descriptions and illustrations of CMZs and delineation guidelines.)

  • Operating Permit means a permit issued pursuant to section 10 of this local law. The term “Operating Permit” shall also include an Operating Permit which is renewed, amended or extended pursuant to any provision of this local law.

  • PAL permit means the major NSR permit, the minor NSR permit, or the State operating permit under a pro- gram that is approved into the State Implementation Plan, or the title V permit issued by the Administrator that establishes a PAL for a major sta- tionary source or a GHG-only source.

  • Regulatory Permits means all Permits granted by the FDA or any comparable Governmental Entity to the Company or any of its Subsidiaries, including investigational new drug applications, Biologics License Applications, manufacturing approvals and authorizations, clinical trial authorizations and ethical reviews, or their national or foreign equivalents.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • Environmental Approval means any consent, authorisation, licence or approval of any governmental or public body or authorities or courts applicable to any Relevant Ship or its operation or the carriage of cargo and/or passengers thereon and/or the provision of goods and/or services on or from such Relevant Ship required under any Environmental Law;

  • Public Procurement Regulatory Authority (PPRA) means the Government Agency responsible for oversight of public procurement.

  • HEPA filter means a high efficiency particulate absolute air filter capable of trapping and retaining 99.97 percent of fibers greater than 0.3 micrometers in mass median aerodynamic diameter equivalent.

  • Native vegetation means plant species that are indigenous to the region.

  • Development Permit means a document authorizing a development issued pursuant to this Land Use Bylaw;

  • Harvested Material means the grain or fodder from crops of the Licensed Varieties grown from Seed or Retained Seed.

  • General permit means a Permit which covers multiple dischargers of a point source category within a designated geographical area, in lieu of individual Permits being issued to each discharger.

  • Slow sand filtration means a process involving passage of raw water through a bed of sand at low velocity (generally less than 0.4 meters per hour) resulting in substantial particulate removal by physical and biological mechanisms.

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Floodplain Development Permit means any type of permit that is required in conformance with the provisions of this ordinance, prior to the commencement of any development activity.

  • Required Regulatory Approvals means the Seller Required Regulatory Approvals and the Buyer Required Regulatory Approvals.

  • Applicable Permit means the Kansas Water Pollution Control and National Pollution Discharge Elimination System Stormwater Runoff from Construction Activities General Permit or a project specific stormwater permit issued to KDOT.