Examples of Minimum Design Criteria in a sentence
These documents must conform to Department requirements, to Appendices A, C, D, E, F, H, I, J, K, L, M, N, and O of these regulations, and to the requirements of the most recent version of the Departmental document "Recommended Minimum Design Criteria For Community Water Supplies," and "Guidance for the Design of DWSIRLF Funded Drinking Water Facilities," or their successor(s).
These documents shall conform to Department requirements, to Subchapters 4-8, of these regulations, and to the requirements of the most recent version of the Departmental document "Recommended Minimum Design Criteria for Community Water Supplies.
Minimum Design Criteria Staff and other agencies that have reviewed the proposal noted the following minimum design criteria.
The manual shall be prepared using the criteria in the NCDEQ, Minimum Design Criteria for the Permitting of Pump Stations and Force Mains.
All wastewater pump stations shall be designed by Professional Engineer licensed in the North Carolina, comply with the NCDEQ, Minimum Design Criteria for the Permitting of Pump Stations and Force Mains and be permitted through NCDEQ.
All electrical systems and equipment shall be designed and installed meeting the standards of Underwriters Laboratories Incorporated (UL), National Electrical Manufacturer’s Association (NEMA), National Fire Protection Association (NFPA), North Carolina State Building Code (NCSBC), National Electrical Code (NEC) and NCDEQ, Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (MDCPPSFM).
Testing of all appurtenances associated with the pump station shall be performed per the NCDEQ, Minimum Design Criteria for the Permitting of Pump Stations and Force Mains and/or local specifications.
Piping and valves shall be designed and installed per the NCDEQ, Minimum Design Criteria for the Permitting of Pump Stations and Force Mains.
This potential measure was considered pursuant to Final Scope Section 2.5.2. The first pit to be mined (East Pit) would be backfilled with the least reactive waste Category 1 and Category 2 waste rock from the later mined pit (West Pit).
Forest damages on local, regional and national level, as well as risk factors are considered.