Metering Interval definition

Metering Interval means the smallest measurement time period over which data are recorded by the CAISO-Approved Meters or Check Meters.
Metering Interval means the smallest measurement time period over which data are recorded by the CAISO- Approved Meters or Check Meters, as applicable.
Metering Interval means a 30-minute metering interval or five-minute metering interval (as applicable).

Examples of Metering Interval in a sentence

  • The Generating Facility shall be deemed to have satisfied the Six-Hour Demonstration if the Power Output in each and every Metering Interval during the six-hour period equals or exceeds the Firm Contract Capacity set forth in Section 1.02(d).

  • The Actual Electricity Output applicable to Billing Month n is determined as follows: AEOn = ∑ AEOUO,j,n where: AEOn = Actual Electricity Output for the preceeding months that are applicable to the Performance factor for the Billing Period n concerned (in kWh) AEOUO,j,m = Actual Electricity Output as measured at the Metering System in the Metering Interval period during which the Facility has been not been curtailed in respect to Article 8.1.2, 8.1.3, 13.5.4 and/or 13.8.2 of the PPA.


More Definitions of Metering Interval

Metering Interval means each of the successive thirty minute periods

Related to Metering Interval

  • Metering Point means, for meters that do not use instrument transformers, the point at which the billing meter is connected. For meters that use instrument transformers, the point at which the instrument transformers are connected.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Net metering system means a facility for the production of electrical energy that does all of the following:

  • Meet Point A point, designated by the Parties, at which one Party’s responsibility for service begins and the other Party’s responsibility ends.

  • Receipt Point means the receipt/inception point(s) where Crude Oil is received into the Gathering System, as such points are specified in Section II of this tariff.

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Delivery Point means the point(s) of connection(s) at which energy is delivered into the Grid System i.e. the Interconnection Point.

  • Net Metering Net metering refers to customers who sell electricity they produce, typically through a rooftop solar panel, back to the utility for credit. If you are a net metering customer, you should not enroll with XOOM because your net metering agreement will not transfer to XOOM once you enroll.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Metering Equipment means all metering equipment installed at the metering points designated in the appropriate appendix to an Interconnection Service Agreement. Minimum State of Charge:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Calibration gas means a gas mixture used to calibrate gas analysers.

  • connecting point means the point at which the drainage installation joins the connecting sewer;

  • Tank means an enclosed space which is formed by the permanent structure of a ship and which is designed for the carriage of liquid in bulk.

  • Surplus Interconnection Service means any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of Interconnection would remain the same. Switching and Tagging Rules:

  • smart metering system means an electronic system that can measure energy consumption, providing more information than a conventional meter, and can transmit and receive data for information, monitoring and control purposes, using a form of electronic communication;

  • Meter means, unless otherwise qualified, a device that measures and registers the integral of an electrical quantity with respect to time.