Major outages definition

Major outages means a service failure lasting for thirty or more minutes that causes the disruption of local exchange or toll services to more than one thousand custom- ers; total loss of service to a public safety answering point or emergency response agency; intercompany trunks or toll trunks not meeting service requirements for four hours or more and affecting service; or an intermodal link blockage (no dial tone) in excess of five percent for more than one hour in any switch or remote switch.
Major outages means a service failure lasting for thirty or more minutes that causes the disruption of local exchange or toll services to more than one thousand customers; total loss of service to a public safety answering point or emergency response agency; inter- company trunks or toll trunks not meeting service requirements for four hours or more and affecting service; or an intermodal link block-
Major outages means a service failure lasting for thirty or more minutes that causes the disruption of local exchange or toll services to more than one thousand custom- ers; total loss of service to a public safety answering point or emergency response agency; intercompany trunks or toll trunks not meeting service requirements for four hours or

Examples of Major outages in a sentence

  • Major outages are identified as Severity1 that have significant impact to City services or Department’s ability to perform critical functions and last over 4 hours in duration.

  • WSR 03-01-065 (Docket No. UT-990146, Gen-eral Order No. R-507), § 480-120-411, filed 12/12/02, effective 7/1/03.] WAC 480-120-412 Major outages.

  • WSR 03-01-065 (Docket No. UT-990146, General Order No. R-507), § 480-120-411, filed 12/12/02, effective 7/1/03.] WAC 480-120-412 Major outages.

  • Major outages include but are not limited to those that affect an entire floor of a building, all of a building, all or parts of several buildings, all or parts of an area, and any high voltage outage.

  • The update frequency is dependent on the service and can be found under section 5.2 After all Major outages we will provide you with an RFO report within 3 business days.

  • Major outages are identified as Severity1 and Severity2 that have significant impact to City services or Department’s ability to perform critical functions and last over 4 hours in duration.

  • Major outages shall occur during semester breaks or at other periods as approved by the university.

  • Major outages consist of complete loss of local or toll service affecting equal to or more than 50% of the customers in the affected exchange or when any outage is expected to exceed 12 hours.

  • No Major outages occurred.Regular follow ups on incidents of possible electricity theft Electricity losses within acceptable range.HIGHLIGHTS AND GOOD PRACTICES : Electrical reticulation throughout Fraserburg is mainly by means of overhead 11kV and low voltage.

  • Major outages often result in immediate impact on suc- cessful call volumes, alarms from many sources, and are usually detected and resolved quickly.Despite such robust operations support, the system always has a number of call defects occurring at any time of the day in the form of “background noise”.


More Definitions of Major outages

Major outages means (a) an unscheduled loss of engineered and installed call or data processing capacity (as measured by the most limiting capacity parameter) in excess of [redacted] or (b) or any unscheduled service-affecting failure in [redacted] or more of the Nodes (but at least [redacted] Nodes) at any one time (according to the system logs).
Major outages means any scheduled outages of any Old Turbine (and/or related equipment) or any New Turbine (and/or related equipment) which will result in the non-operation of such Old Turbine or New Turbine for a consecutive period of three (3) or more days.

Related to Major outages

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Outage has the meaning set forth in the CAISO Tariff.

  • Outages means the planned unavailability of transmission and/or generation facilities dispatched by PJM or the NYISO, as described in Section 35.9 of this Agreement.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Unscheduled Outage means any outage that is not a “Scheduled Outage”. “Committed Time” shall mean, as to each Business Day, one hour before the trading session for that day is scheduled to open on the NYSE and one hour after the trading session on the NYSE for that day finally closes, but excluding the following periods of Scheduled Outage (defined below). A “Scheduled Outage” shall mean (1) those time periods from 12 AM Saturday to 6:00 AM Sunday each week and 11:00 PM to 12:00 AM daily, during which Computershare’s System maybe unavailable due to routine maintenance; and (2) any time period as to which Company has received prior notice. ≥99.5% <99.5% to ≥98% <98%

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Unplanned Service Interruption means any Service Interruption where events or circumstances prevent the timely communication of prior warning or notice to the Trader or any affected Customer;

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Major disaster means any natural catastrophe (including any hurricane, tornado, storm, high water, winddriven water, tidal wave, tsunami, earthquake, volcanic eruption, landslide, mudslide, snowstorm, or drought), or, regardless of cause, any fire, flood, or explosion, in any part of the United States, which in the determination of the President causes damage of sufficient severity and magnitude to warrant major disaster assistance under this Act to supplement the efforts and available resources of States, local governments, and disaster relief organizations in alleviating the damage, loss, hardship, or suffering caused thereby.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Planned Downtime means planned downtime for upgrades and maintenance to the Services scheduled in advance of such upgrades and maintenance.

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.

  • Force Majeure Period has the meaning specified in Section 13.1.

  • Severity 2 means the unavailability of an individual resource and redundant capability is not available or exhausted.

  • Unscheduled Downtime means any time when any or all of the applications and Services provided by the Supplier to the Customer shall be unavailable to the Customer due to unexpected system failures other than Scheduled Downtime or the downtime is attributable to events not under the control of the Supplier.

  • Major Damage means damage that in the estimation of the surveyor exceeds USD

  • Service Level Failure means a failure to perform the Software Support Services fully in compliance with the Support Service Level Requirements.