Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.
Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area. Notwithstanding the foregoing, effective with the 2024/2025 Delivery Year, during the auction process, the Office of Interconnection shall exclude from the Locational Deliverability Area Reliability Requirement any Planned Generation Capacity Resource in an LDA that does not participate in the relevant RPM Auction as projected internal capacity and in the Capacity Emergency Transfer Objective
Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area, and less any necessary adjustment for Price Responsive Demand proposed in a PRD Plan or committed following an RPM Auction for the Zones comprising such Locational Deliverability Area for such Delivery Year.

Examples of Locational Deliverability Area Reliability Requirement in a sentence

  • The Office of the Interconnection shall determine the PJM Region Reliability Requirement and the Locational Deliverability Area Reliability Requirement for each Locational Deliverability Area for which a Variable Resource Requirement Curve has been established for such Base Residual Auction on or before February 1, prior to the conduct of the Base Residual Auction for the first Delivery Year in which the new values will be applied, in accordance with the Reliability Assurance Agreement.

  • The same process as set forth in subsection (a)(i) shall be used to establish the Variable Resource Requirement Curve for any such LDA, except that the Locational Deliverability Area Reliability Requirement for such LDA shall be substituted for the PJM Region Reliability Requirement and the LDA Short-Term Resource Procurement Target shall be substituted for the PJM Region Short-Term Resource Procurement Target.

  • The same process as set forth in subsection (a)(i) shall be used to establish the Variable Resource Requirement Curve for any such LDA, except that the Locational Deliverability Area Reliability Requirement for such LDA shall be substituted for the PJM Region Reliability Requirement and, for Delivery Years through May 31, 2018, the LDA Short-Term Resource Procurement Target shall be substituted for the PJM Region Short-Term Resource Procurement Target.

  • It is recognized that the variable resource requirement reflected in the Variable Resource Requirement Curve can result in an optimized auction clearing in which the level of Capacity Resources committed for a Delivery Year exceeds the PJM Region Reliability Requirement (less the Short-Term Resource Procurement Target) or Locational Deliverability Area Reliability Requirement (less the Short-Term Resource Procurement Target for the Zones associated with such LDA) for such Delivery Year.

  • The same process as set forth in subsection (a)(i) shall be used to establish the Variable Resource Requirement Curve for any such LDA, except that the Locational Deliverability Area Reliability Requirement for such LDA shall be substituted for the PJM Region Reliability Requirement and, for Delivery Years through May 31, 2018, the LDA Short-Term Resource Procurement Target shall be substituted for the PJM Region Short- Term Resource Procurement Target.

  • Beyond one mile of an urban area where only occasional pedestrian traffic is expected, a shoulder (paved and unpaved) would meet the need for a pedestrian way.

  • PJM argues that “any prediction of anticipated clearing prices based on a posted Locational Deliverability Area Reliability Requirement is not guaranteed.”274 PJM contends that sellers that chose to make business decisions based on anticipated prices did so at their own risk.

  • For each LDA and for the PJM Region, the Preliminary Market Structure Screen will be based on: (1) the Unforced Capacity available for such Delivery Year from Generation Capacity Resources located in such area; and (2) the Locational Deliverability Area Reliability Requirement and the PJM Reliability Requirement.

  • It is recognized that the variable resource requirement reflected in the Variable Resource Requirement Curve can result in an optimized auction clearing in which the level of Capacity Resources committed for a Delivery Year exceeds the PJM Region Reliability Requirement (less the Forecast RTO ILR Obligation) or Locational Deliverability Area Reliability Requirement (less the Forecast Zonal ILR Obligation for the Zones associated with such LDA) for such Delivery Year.

  • As an example, PJM states that a proportionately large quantity of solar resources has a relatively lower capacity value in near winter-peaking LDAs. 24 PJM ER23-729-000 Transmittal at 12-13 (citing PJM, Intra-PJM Tariffs, Definitions L-M-N (definition of Locational Deliverability Area Reliability Requirement).


More Definitions of Locational Deliverability Area Reliability Requirement

Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the sum of all Preliminary Unforced Capacity Obligations of all FRR Entities in such Locational Deliverability Area.
Locational Deliverability Area Reliability Requirement means the projected internal

Related to Locational Deliverability Area Reliability Requirement

  • Locational Deliverability Area or “LDA” shall mean a geographic area within the PJM Region that has limited transmission capability to import capacity to satisfy such area’s reliability requirement, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, and as specified in Reliability Assurance Agreement, Schedule 10.1.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • Clinical nurse specialist means a registered nurse with relevant post-basic qualifications and 12 months’ experience working in the clinical area of his/her specified post-basic qualification, or a minimum of four years’ post-basic registration experience, including three years’ experience in the relevant specialist field and who satisfies the local criteria.