Leak Point definition

Leak Point means the pressure at which a PRD first opens to release vapors, as determined in accordance with Paragraph 35.
Leak Point means the lowest pressure at which emissions are released from any pressure relief devices on a Tank System, as determined consistent with the Closed Loop Design Guideline. For purposes of establishing the Leak Point for a Closed Loop Vapor Control System, the value of the Leak Point will not be a value exceeding the Set Point.
Leak Point means the lowest pressure at which emissions are released from any pressure relief devices, including thief hatches, on a Vapor Control System. The Leak Point may be determined by measurement of the Vapor Control System pressure during pressurization of the Vapor Control System, noting the lowest pressure at which emissions are observed from any Vapor Control System pressure relief device during the field survey. For purposes of establishing the Leak Point for a Closed Loop Control System, the value of the Leak Point must not exceed the lowest rated pressure at which any Vapor Control System pressure relief device is designed to open or relieve pressure.

Examples of Leak Point in a sentence

  • The date and method of verification is not required if the corrective action is taken only in response to exceedances of the Leak Point detected through the Closed Loop Vapor Control System.

  • The purpose of the Closed Loop Design Guideline is to prescribe the steps taken to design, install and optimize Closed Loop Vapor Control Systems by reading tank pressures and controlling liquid flow and vapor flow to the tanks, thereby controlling the Potential Peak Instantaneous Vapor Flow Rate, PPIVFR duration, or PPIVFR frequency, to ensure tank pressure does not exceed the Leak Point.

  • Control Point” shall mean the designated pressure at which the Closed Loop Vapor Control System control logic takes action ( e.g., closes valves) to maintain the Tank System pressure below the Leak Point.

  • Following the optimization phase, Shut-In of all wells associated with a Closed Loop Vapor Control System resulting from a pressure reading at or above the Leak Point.

  • Following the optimization phase, a pressure reading at or above the Leak Point at a Closed Loop Vapor Control System.

  • Yet when one adds to it the many titles addressing church unity which do not happen to use that particular word in the title, as well as the many more works which mention ecclesiastical unity within a discussion of other issues, it is clear that this topic was a significant part of public religious debate and discussion.might change their emphasis later in another situation.

  • By annually assessing student-learning outcomes, course completion rates, and instructional costs, an institution can assure all stakeholders that redesign continues to work as initially conceived and implemented.

  • A Closed Loop Control System automatically regulates hydrocarbon flow to the Tank System, thereby controlling the vapor flow rate, duration, and frequency to maintain Vapor Control System pressure below the Leak Point of the Vapor Control System pressure relief device(s) as described in the Closed Loop Design Guideline.

  • Apache shall confirm that the Trigger Point is below the Leak Point by using representative Vapor Control System field testing (verified with an IR Camera), or by using representative PRD bench testing.

  • This has arisen in part because of the development of the concept of Valsalva Leak Point Pressure (VLPP) [222, 223] and more recent analyses of long term results of stress incontinence surgery [224].VLPP emerged as an alternative method to study urethral closure during stress for studies of urethral bulking with collagen.


More Definitions of Leak Point

Leak Point means the pressure at which a PRD first opens to release vapors.

Related to Leak Point

  • Meet Point A point, designated by the Parties, at which one Party’s responsibility for service begins and the other Party’s responsibility ends.

  • Demarcation Point means the point where Qwest owned or controlled facilities cease, and CLEC, End User Customer, premises owner or landlord ownership or control of facilities begin. "Designed, Verified and Assigned Date" or "DVA" means the date on which implementation groups are to report that all documents and materials have been received and are complete.