Issued for Construction Documents definition

Issued for Construction Documents shall consist of all drawings (1/8” scale) and specifications necessary to construct all Premises improvements including, without limitation, architectural and structural working drawings and specifications and Mechanical and Electrical Working Drawings and Specifications and all applicable governmental authorities plan check corrections.
Issued for Construction Documents or “IFC” means the design drawings, Design Data, Technical Specifications and other documents included in the IFC Submittal which have been sealed by the Professional of Record and endorsed as “Received” by the City pursuant to Schedule 5Review Procedure;
Issued for Construction Documents means the detailed drawings and specifications setting forth in detail the requirements for the construction of the Facility.

Examples of Issued for Construction Documents in a sentence

  • B.6 Issued for Construction Documents B.6.1 Services & Deliverables: The A/E shall be required to develop an Issued for Construction Set of construction documents (“IFC Set”).

  • This amount includes Concept Design fee of $[INSERT]; Schematic Design fee of $[INSERT]; Design Development fee of $[INSERT]; a Permit Set fee of $[INSERT]; Issued for Construction Documents fee of $[INSERT]; Construction Administration & Close-out fee of $[INSERT]; and an Owner’s Allowance of $[INSERT] for permit fees as set forth in Section 4.5 of this Agreement, all in accordance with the A/E’s Price Proposal included as Exhibit B.

  • B.2.5 Issued for Construction Documents B.2.5.1 Services & Deliverables: The A/E shall be required to develop an Issued for Construction Set of construction documents (“IFC Set”).

  • If the Contractor discovers any inconsistencies, improper cross references, omissions or ambiguities in the accepted Issued for Construction Documents, or Change Orders in the Construction Documents it shall promptly notify the Project Representative.

  • The Issued for Construction Documents set shall bear the signature and seal of the Designer of Record for every Project.

  • This amount includes Concept Design fee of $[INSERT]; Schematic Design fee of $[INSERT]; Design Development fee of $[INSERT]; Permit Set fee of $[INSERT]; Issued for Construction Documents fee of $[INSERT]; Construction Administration & Close-out fee of $[INSERT]; and an Owner’s Allowance of $[300,000.00] for permit fees as set forth in Section 4.5 of this Agreement.

  • The Permit Set Phase shall not be considered complete unless and until a GMP for the Project is agreed upon.B.2.5 Issued for Construction Documents B.2.5.1 Services & Deliverables: The A/E shall be required to develop an Issued for Construction Set of construction documents (“IFC Set”).

  • CHANGES TO DRAWINGS — (Changes to be shown on Issued for Construction Documents) Change 1: Delete “Root Barrier” in its entirety from the assembly of the Type III vegetated roof over the trellis.

  • Provide Issued for Construction Documents, incorporating PAG and stakeholder final comments on the 90% Design Documents.

  • The Issued for Construction Documents shall consist of all drawings (1/8" scale) and specifications necessary to construct all Tenant Work in form and detail sufficient to secure all required governmental approvals and to demonstrate conformity with the Landlord's standards and quality.


More Definitions of Issued for Construction Documents

Issued for Construction Documents has the meaning as set out in Schedule 18 – Technical Requirements;
Issued for Construction Documents. The "Issued for Construction Documents" shall consist of all drawings (1/8" scale) and specifications necessary to construct all Premises improvements including, without limitation, architectural and structural working drawings and specifications and Mechanical and Electrical Working Drawings and Specifications and all applicable governmental authorities plan check corrections.

Related to Issued for Construction Documents

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Construction Documents means the plans, specifications, approved change orders, revisions, addenda and other information approved by the City, which set forth in detail the Work to be performed for a construction Project.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • the Constitution means the Constitution of the Republic of South Africa, Act 108 of 1996

  • Construction Agreements means agreements to which Tenant is a party for Construction Work, rehabilitation, alteration, repair, replacement or demolition performed pursuant to this Lease.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.

  • WTO GPA country construction material means a construction material that—

  • Application Documents means collectively: (i) the grant application submitted by Grantee, including all exhibits, schedules, appendices and attachments thereto; (ii) all documents, correspondence and other written materials submitted in respect of such grant application; and (iii) all amendments, modifications or supplements to any of the foregoing approved in writing by City.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction Agreement as used in this subsection means an agreement between Seller and any contractor or subcontractor to install the System;

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Foreign construction material means a construction material other than a domestic construction material.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Construction and demolition debris means and includes:

  • Caribbean Basin country construction material means a construction material that—

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.