Interconnection Facilities Study definition

Interconnection Facilities Study. Agreement shall mean the form of agreement contained in Appendix 4 of the Standard Large Facility Interconnection Procedures for conducting the Interconnection Facilities Study. Interconnection Feasibility Study shall mean a preliminary evaluation of the system impact and cost of interconnecting the Large Generating Facility to the New York State Transmission System, the scope of which is described in Section 30.6 of the Standard Large Facility Interconnection Procedures.
Interconnection Facilities Study. Agreement shall mean the form of agreement contained in Appendix 2 of the Standard Large Facility Interconnection Procedures for conducting the Interconnection Facilities Study. Interconnection Request shall mean a Interconnection Customer’s request, in the form of Appendix 1 to the Standard Large Facility Interconnection Procedures, in accordance with the Tariff, to interconnect a new Large Generating Facility to the New York State Transmission System or to the Distribution System, or to materially increase the capacity of, or make a material modification to the operating characteristics of, an existing Large Generating Facility that is interconnected with the New York State Transmission System or with the Distribution System. Interconnection Study shall mean any of the following studies: the Optional Interconnection Feasibility Study, the, Interconnection System Reliability Impact Study, and the Interconnection Facilities Study described in the Standard Large Facility Interconnection Procedures.
Interconnection Facilities Study means a study conducted by a Public Utility or a third-party consultant retained by the Public Utility or the Applicant that determines the additional Interconnection Facilities and System Upgrades required to interconnect the Small Generator Facility to the Public Utility’s TDS, the cost of the facilities and upgrades, and the time required to complete the interconnection.

Examples of Interconnection Facilities Study in a sentence

  • In accordance with Section 8 of the LGIP and unless otherwise mutually agreed, the Alternate Option is not an available option if the Interconnection Customer waived the Interconnection Facilities Study.

  • It shall also include any additional information provided to Interconnecting Transmission Owner and System Operator for the Interconnection Feasibility Study, Interconnection System Impact StudyCluster Study, Transitional Cluster Study, and Interconnection Facilities Study.


More Definitions of Interconnection Facilities Study

Interconnection Facilities Study means a study conducted by a utility for the customer-generator that determines the additional or upgraded distribution system facilities, the cost of those facilities, and the time schedule required to interconnect the net metering facility to the utility's distribution system.
Interconnection Facilities Study. Agreement shall mean the form of agreement contained in Appendix 4 of the LGIPe Standard Large Generator Interconnection Procedures for conducting the Interconnection Facilities Study.
Interconnection Facilities Study. Agreement shall mean the form of agreement contained in Appendix 4 of the Standard Large Facility Interconnection Procedures for conducting the Interconnection Facilities Study. Interconnection Feasibility Study shall mean a preliminary evaluation of the system impact and cost of interconnecting the Large Generating Facility to the New York State Transmission System, the scope of which is described in Section 30.6 of the Standard Large Facility Interconnection Procedures. Interconnection Feasibility Study Agreement shall mean the form of agreement contained in Appendix 2 of the Standard Large Facility Interconnection Procedures for conducting the Interconnection Feasibility Study. Interconnection Request shall mean a Developer’s request, in the form of Appendix 1 to the Standard Large Facility Interconnection Procedures, in accordance with the Tariff, to interconnect a new Large Generating Facility to the New York State Transmission System, or to increase the capacity of, or make a material modification to the operating characteristics of, an existing Large Generating Facility that is interconnected with the New York State Transmission System. Interconnection Study shall mean any of the following studies: the Interconnection Feasibility Study, the Interconnection System Reliability Impact Study, and the Interconnection Facilities Study described in the Standard Large Facility Interconnection Procedures.
Interconnection Facilities Study. Report shall mean the report issued following completion of an Interconnection Facilities Study pursuant to Section 8 of the LGIP. Interconnection Feasibility Study shall mean a preliminary evaluation of the system impact and cost of interconnecting the Generating Facility to the Administered Transmission System, the scope of which is described in Section 6 of the Standard Large Generator Interconnection Procedures.
Interconnection Facilities Study means a detailed study conducted by the EDC or a third-party consultant to identify a list of Interconnection Facilities and System Upgrades required to address Adverse System Impacts (as identified in the Interconnection System Impact Study), the cost of those facilities, and the time required to interconnect the Small Generator Facility with the EDC’s T&D System.
Interconnection Facilities Study. Report shall mean the report issued following completion of an Interconnection Facilities Study pursuant to Section 8 of this SGIP. Interconnection Request shall mean an Interconnection Customer’s request, in the form of Appendix 1 to this SGIP, in accordance with the Tariff, to: (i) interconnect a new Generating Facility to the Administered Transmission System as either a CNR or a NR; (ii) make a Material Modification to a proposed Generating Facility with an outstanding Interconnection Request; (iii) increase the energy capability or capacity capability of an existing Generation Facility; (iv) make a Material Modification to the design or operating characteristics of an existing Generating Facility, including its Interconnection Facilities, that is interconnected with the Administered Transmission System; (v) commence participation in the wholesale markets by an existing Generating Facility that is interconnected with the Administered Transmission System; or (vi) change from NR Interconnection Service to CNR Interconnection Service for all or part of a Generating Facility’s capability. Interconnection Request shall not include a request to interconnect a Qualifying Facility (as defined by the Public Utility Regulatory Policies Act, as amended by the Energy Policy Act of 2005 and the regulations thereto), where the Qualifying Facility’s owner intent is to sell 100% of the Qualifying Facility’s output to its interconnected electric utility. Interconnection Service shall mean the service provided by the System Operator, and the Interconnecting Transmission Owner, associated with interconnecting the Interconnection Customer’s Generating Facility to the Administered Transmission System and enabling the receipt of electric energy capability and/or capacity capability from the Generating Facility at the Point of Interconnection, pursuant to the terms of the SGIA and, if applicable, the Tariff. Interconnection Study shall mean any of the following studies: the Cluster Interconnection System Impact Study, the Cluster Study, Cluster Interconnection Facilities Study the Cluster Restudy, the Surplus Interconnection Service System Impact Study, the Interconnection Facilities Study and the Optional Interconnection Study described in this SGIP. Interconnection Study Agreement shall mean any of the following agreements: the Affected System Study Agreement, Cluster Study Agreement, the Interconnection Facilities Study Agreement, and the Optional Interconnection Study Agr...