Examples of Interconnection Facilities in a sentence
Total CostThe total cost estimate for this Network Upgrade is: $2,462,67069 kV Substation Transformer$7,388AFUDC$0Contingency$2,470,058Total This estimate is accurate to +/- twenty (20) percent, based on current prices, in accordance with Attachment A of Appendix 4 of the Interconnection Facilities Study Agreement.However, recent cost fluctuations in materials are very significant and the accuracy of this estimate at the time of actual settings cannot be assured.
The Parties shall cooperate with each other to restore the Generating Facility, Interconnection Facilities, and Transmission Provider’s Transmission System to their normal operating state as soon as reasonably practicable following any reduction or temporary disconnection.
Table 1: Transmission Owner Interconnection Facilities (TOIF) Transmission Owner Interconnection Facilities (TOIF)Total Cost Estimate ($)Table 2: Non-Shared Network Upgrade(s) Non-Shared Network Upgrades Description SHARED NETWORK UPGRADE(S)The Interconnection Customer’s share of costs for Shared Network Upgrades is estimated in Table 3below.
Fuel Cell Customer-Generator shall be solely responsible for the costs, design, purchase, construction, operation, and maintenance of the Interconnection Facilities that Fuel Cell Customer-Generator owns.
Transmission Provider and Interconnection Customer, as appropriate, shall provide Interconnection Facilities that adequately protect Transmission Provider’s Transmission System, personnel, and other persons from damage and injury.