Initial Tests definition

Initial Tests means the tests to be undertaken with respect to the Installed Capacity of the Facility in order to achieve the Commercial Operation Date.
Initial Tests means the tests that the Supplier must carry out on the System to determine whether it is in accordance with the Specification before providing such System to University for Acceptance Tests;

Examples of Initial Tests in a sentence

  • Regulation 15Construction and Initial Tests of Watertight Doors, Sidescuttles, etc.

  • However, given the often sharply different operating philosophies of the American and Russian programs, the segmented structure reduces the potential for conflict by allowing each side the freedom to operate many systems as they think best without having to coordinate or compromise with the other program.

  • Regulation 16Construction and Initial Tests of Watertight Decks, Trunks, etc.(a) Watertight decks, trunks, tunnels, duct keels and ventilators shall be of the same strength as watertight bulkheads at corresponding levels.

  • Initial Tests and Measurements: Before final adjusting and acceptance tests are scheduled, perform system checkout.

  • Initial Tests: Within 30 calendar days of completion of construction or modification of any vapor recovery system, the owner or operator shall conduct and pass all applicable performance tests.

  • Acceptance Testing Results and Initial Tests (Make a Category 6d for each material such as, 6d1.i, Cl 2 Base Test Summary Log, 6d2.ii Cl 2 Base Test Results- 6d2.i AC Test Results Log etc.

  • When the shoot is not in use both the cover and the valve shall be kept closed and secured.Regulation 15 Construction and Initial Tests of Watertight Doors, Sidescuttles, etc.

  • Regulation 16Construction and Initial Tests of Watertight Decks, Trunks, etc.

  • Initial Tests were carried at seven locations within the footprint of the proposed SuDS basins.

  • If the Portfolio Agent determines that the proposed Substitutions specified in the Substitution Requests in respect of such Substitution Request Date do not comply with the Initial Tests for Entry, then the Substitution Requests in respect of such Substitution Request Date shall be deemed to be invalid and of no effect.

Related to Initial Tests

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Covenant Testing Period means the period commencing on the last day of the fiscal month of Borrower most recently ended prior to the occurrence of a Fixed Charge Test Commencement Date for which month Borrowers have delivered to Agent monthly financial statements of Solutions and its Subsidiaries, and continuing until the Termination Date has occurred.

  • Time for Completion means the time for completing the Works as stated in the Contract Data (or as extended under Sub-Clause 7.3), calculated from the Commencement Date.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Initial compliance period means the first full three-year compliance period which begins at least 18 months after promulgation, except for the following contaminants: Dichloromethane; 1,2,4-Trichlorobenzene; 1,1,2- Trichloroethane; Benzo[a]pyrene; Dalapon; Di(2-ethylhexyl adipate; Di(2-ethylhexyl) phthalate; Dinoseb; Diquat; Endothall; Endrin; Glyphosate; Hexachlorobenzene; Hexachlorocyclopentadiene; Oxamyl (Vydate); Picloram; Simazine; 2,3,7,8-TCDD (Dioxin); Antimony; Beryllium; Cyanide; Nickel; and Thallium, initial compliance period means the first full three-year compliance period after promulgation for systems with 150 or more service connections (January 1993 -December 1995) and first full three-year compliance period after the effective date of regulation (January 1996 - December 1998) for systems having fewer than 150 service connections.

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • LCT Test Date shall have the meaning provided in Section 1.12(b).

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Project Year means the 12 month period beginning from the Effective Date and ending 12 months thereafter and each successive 12 month period following thereafter;

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Annual Work Plan means any of the Annual Work Plans.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Annual Work Plan and Budget means the work plan and budget approved by the Bank and adopted by the Borrower in accordance with the provisions of Section I.C of Schedule 2 of this Agreement, as said work plan and budget may be modified from time to time with the written agreement of the Bank.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Improvement warranty period means a period:

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.