Initial Operation means the first integral operation of the complete equipment covered under the Contract with the sub-system and supporting equipment in service or available for service.
Commercial Operations Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operations on the Day specified in Seller's written notice described below: (i) the Acceptance Test has been passed, (ii) all generating units have passed Control System Acceptance Tests, (iii) the Transfer Date has occurred, (iv) Seller has (1) provided to Company the Required Models (as defined in Section 6(a) (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller)) in the form of Source Code, (2) placed the current version of the Source Code for the Required Models with the Source Code Escrow Agent as required in Section 6(b)(i)(A) (Establishment of Source Code Escrow) of Attachment B (Facility Owned by Seller), or (3) if Seller is unable to arrange for the placement of the appropriate Source Code into the Source Code Escrow account, placed the required funds with the Monetary Escrow Agent as required in Section 6(b)(ii)(A) (Establishment of Monetary Escrow) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operations Date and (bb) the Commercial Operations Date will occur within 24 hours (i.e., the next Day).
Commercial Operation means the condition of operation in which the complete equipment covered under the Contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the Contractor of any of his obligations under the Contract.
Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.
Commercial Operation Date means the date on which a Material Project is substantially complete and commercially operable.
Commercial Operator means the person appointed by MDL as commercial operator of the Maui Pipeline from time to time.
Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;
Commence commercial operation means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation subject to the following:
Project Start Date means the first Milestone Start Date specified in Schedule B;
Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.
Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.
Surgical Operation means manual and/or operative procedures for correction of deformities and defects, repair of injuries, diagnosis and cure of diseases, relief of suffering and prolongation of life.
Exploration Operations means operations conducted in the Contract Area pursuant to this Contract in searching for Petroleum and in the course of an Appraisal Programme and shall include but not be limited to aerial, geological, geophysical, geochemical, palaeontological, palynological, topographical and seismic surveys, analysis, studies and their interpretation, investigations relating to the subsurface geology including structural test drilling, stratigraphic test drilling, drilling of Exploration Xxxxx and Appraisal Xxxxx and other related activities such as surveying, drill site preparation and all work necessarily connected therewith that is conducted in connection with Petroleum exploration.
Date of Commercial Operation or “COD” means
Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;
Drilling operations means the drilling of an oil and gas well and the production and completion operations ensuing from the drilling which require entry upon the surface estate and which were commenced after June 30, 1979, and oil and gas geophysical and seismograph exploration activities commenced after June 30, 1983.
Commercial Operation Date (COD) means the date certified by the DISCOM’s committee upon successful commissioning (as per provisions of the PPA) of the project when all equipments as per rated capacity have been installed and energy has flown into the grid.
Normal Operating Conditions means those Service conditions which are within the control of Grantee. Those conditions which are not within the control of Grantee include, but are not limited to, natural disasters, civil disturbances, power outages, telephone network outages, and severe or unusual weather conditions. Those conditions which are ordinarily within the control of Grantee include, but are not limited to, special promotions, pay-per-view events, rate increases, regular peak or seasonal demand periods, and maintenance or upgrade of the Cable System.
Generation Operations Center means the location of Buyer’s real-time operations personnel.
Commencement of Operations means, with respect to any Facility, the completion and the performance of all of the following activities:
Infill development means new construction on a vacant commercial lot currently held as open space.
Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.
Annual Operating Plan has the meaning ascribed to it in Section 15.3(b)(i).
Annual Operating Budget has the meaning set forth in Section 4.11.
Major development means an individual “development,” as well as multiple developments that individually or collectively result in:
Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;