Initial Commissioning definition

Initial Commissioning means the partial commissioning of the [facility] [systems and equipment] under the specified conditions except as indicated in Final Commissioning. Completion of Initial Commissioning is a prerequisite to Substantial Performance of the Work.
Initial Commissioning means the process of training and demonstrating the equipment and software to VAA staff or other personnel.
Initial Commissioning means, as the context requires, the initial commissioning of: Internal Secondary Distribution Network; Metering Systems; HIUs, in accordance with the Specification and Applicable Laws, Good Industry Practice and any Policies relevant to the commissioning of the same.

Examples of Initial Commissioning in a sentence

  • Before starting operations following maintenance or repair work, all initial tests must be carried out as described in “Machine Settings for Initial Commissioning by the Service Engineer”.

  • The Section 31 Agreement states “Whenever an overspend is projected whether within the Initial Commissioning Pooled Fund or the Adult Mental Health Integrated Budget the relevant Partners shall agree how to manage the overspend in order to achieve financial balance and the Partners shall keep the position under review.

  • Verification: At least four (4) weeks prior to the first firing of natural gas in either turbine, the project owner shall submit a detailed Initial Commissioning Plan to the District and the CPM.

  • The Contractor shall not be obliged to remedy faults caused by the use of force or improper handling (non-functional use) under the rental agreement.

  • Not later than [fourteen (14)] days before the commencement of the Initial Commissioning of the Primary Distribution Network the Developer shall provide ESCo with the following information: installation drawings in pdf and AutoCAD format to reflect the status of the installation at that time; manufacturers’ testing and commissioning records; and method statements for the proposed testing for review.

  • Initial Commissioning Coordination Meeting: This meeting is intended to present the Commissioning Plan to the Contractor and is typically scheduled to occur after bid award and prior to installation of commissioned systems.

  • Not later than [fourteen (14)] days before the commencement of the Initial Commissioning of the Secondary Distribution Network the Developer shall provide ESCo with the following information: installation drawings in pdf and AutoCAD format to reflect the status of the installation at that time; manufacturers’ testing and commissioning records; and method statements for the proposed testing for review.

  • Upon completion of the Initial Commissioning of the Secondary Distribution Network the Developer shall invite ESCo to witness the Initial Commissioning of the Secondary Distribution Network.

  • However, additional coding is required for big data sets since it is not feasible to enter data to the spreadsheet form manually.

  • The EA on reviewing Counsel’s opinion had reversed their previous stance.


More Definitions of Initial Commissioning

Initial Commissioning means the partial commissioning of the systems and equipment under the specified conditions except as indicated in Final Commissioning. Completion of Initial Commissioning is a prerequisite to Substantial Performance of the Work.

Related to Initial Commissioning

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];

  • Initial Budget has the meaning set forth in Section 7.06(a).

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Project area budget means a multiyear projection of annual or cumulative

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Target Completion Date has the meaning given such term in Section 3.3(b).

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.