Examples of Hydrographic Survey in a sentence
Hydrographic Survey: A survey having for its principal purpose the determination of data relating to bodies of water, and which may consist of the determination of one or several of the following classes of data; depth of water and configuration of bottom; directions and force of current; heights and times and water stages; and location of fixed objects for survey and navigation purposes.
These steps will be determined by HSD/NSD and will be specified in the Hydrographic Survey Project Instructions.
Topographic / Hydrographic Survey: Prior to the commencement of the work, the Contractor shall conduct a topographic/hydrographic survey in conjunction with the Engineer’s instructions.
Hydrographic Survey: a survey having as its principal purpose the determination of data relating to bodies of water, and which may consist of the determination of one or several of the following classes of data: depth of water and configuration of bottom; directions and force of current; heights and times of water stages; and location of fixed objects for survey and navigation purposes.
Hydrographic Survey Deliverables:The Contractor shall reduce, edit, correct and combine overbank and hydrographic survey data in the EM file format as outlined in the referenced EM File Format Specifications and, if specified, the legacy file format "MVN Extended LMN830 Format (LMN830 format specifications will be provided on request).
The portions of the Zuni River Basin Adjudication Hydrographic Survey Report for Subarea Ramah (January 2007, as amended), prepared by Natural Resources Consulting Engineers, Inc.
AREA SURVEYED This hydrographic survey was conducted in accordance with Hydrographic Survey Letter Instructions* for project OPR-A397-TJ03, Approaches to Boston, Massachusetts.
Hydrographic Survey: Hydrographic surveys shall be conducted by the Contractor using DGPS and/or RTK-GPS positioning equipment and shall use single-beam transducer sounding techniques for measuring depths.
The proposed survey boat should be equipped with DGPS (Beacon Based), Echo sounder, Hypac Max acquisition and navigating software or equivalent, Qualified Hydrographic Survey personnel for conducting bathymetric surveys and provide survey charts in required numbers after duly processing the above acquired data using HYPAC MAX Processing System or equivalent.
Hydrographic survey work (if required) shall be conducted in accordance with USACE standards for Class 1 Hydrographic Survey for Navigation and Dredging support surveys in accordance with EM 1110-2-1003, Hydrographic Surveying.