Global Project definition

Global Project as defined in the Preamble of the Agreement.
Global Project means all the activities undertaken by the Parties in order to build, render operational and commercialize the Rail Baltica railway and related railway infrastructure in accordance with the agreed route, technical parameters and time schedule. „Implementing Bodies“ means OÜ Rail Baltic Estonia, SIA „Eiropas dzelzceļa līnijas“, UAB „Rail Baltica statyba", AB „Lietuvos geležinkeliai“ and Estonian Technical Regulatory Authority, as well as shall mean any other implementing body so designated by the Beneficiaries in CEF Grant Agreements in future.

Examples of Global Project in a sentence

  • Epidemiology of antituberculosis drug resistance (the Global Project on Anti-tuberculosis Drug Resistance Surveillance): an updated analysis.

  • Rosemary Nagy, ‘Transitional Justice as Global Project: Critical Reflections,’ Third World Quarterly 29 (2008): 275–289.

  • If the proposed Action does not constitute such a unit, the CBA should be prepared for a broader perimeter rather than the specific Action and as last resort option the Global Project.

  • All students are advised to consult the list of projects offered at WPI’s Global Project Centers .

  • Rosemary Nagy, ‘Transitional Justice as Global Project: Critical Reflections,’ Third World Quarterly 29(2) (2008): 287.

  • The CTA will be assisted by a Global Project Coordinator/Technical Advisor; a Senior Public Health Advisor provided by WHO; and a Senior Policy Advisor provided by HCWH.

  • Engine and its accessories must be used in accordance with the RMC Global 2022 Technical Regulations.REGULATIONProject E20, the powertrain and its accessories must be used in accordance with the RMC Global Project E20 2022 Technical Regulations.

  • In accordance with this mandate, a Global Project was launched with the main objective being to “support Member States in achieving a functional universal legal regime against terrorism in accordance with the principles of the rule of law”.

  • CONTRACT RESEARCH ORGANISATION (CRO): QUINTILES LIMITEDStation House,Market Street, Bracknell, Rg12 1HXUnited Kingdom www.quintiles.com Project Manager:Barbara MagetCNS Therapeutics, Global Project Management, Phone: +32 81 60 09 61Fax: +32 81 60 09 62barbara.maget@quintiles.com SPONSOR:BIAL - Portela & Ca, S.A. À Av. Siderurgia Nacional4745-457 S.

  • Tyres as specified in the Global RMC 2022 Technical Regulations are the only tyres allowed for the RMC 2022.Project E20 Tyres as specified in the RMC Global Project E20 2022 Technical Regulations.

Related to Global Project

  • Infrastructure project means any construction or acquisition of treatment works,

  • Capital Project means a project consisting of the construction, rehabilitation, demolition, relocation, preservation, acquisition, or other physical improvement that is an integral part of, or is necessary for completion of a Project.

  • Capital Projects means the acquisition of any interest in land, including improvements on the

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Development Project means a project for the development of land within a

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Commercial project means any project, including, but not

  • Redevelopment project means any work or undertaking

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Project area plan means a written plan that, after the plan's effective date, guides and controls the development within a project area.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Residential Project means a redevelopment project that is

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Project area budget means a multiyear projection of annual or cumulative

  • Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).