Geotechnical Exploration definition

Geotechnical Exploration. The term “Geotechnical Exploration,” also referred to as “Sub-bottom Sampling,” or “Geotechnical Testing,” is used to collectively refer to site specific sediment and underlying geologic data acquired from the seafloor and the sub- bottom and includes geotechnical surveys utilizing deep borings, vibracores, and cone penetration tests.
Geotechnical Exploration. The term “Geotechnical Exploration” is used to refer to the process by which site-specific sediment and underlying geologic data are acquired from the seafloor and the sub-bottom and includes geotechnical surveys utilizing borings, vibracores, and cone penetration tests.

Examples of Geotechnical Exploration in a sentence

  • The Developer and the County recognize the existence of certain surface and subsurface geotechnical conditions at the Project Site, as reflected in the Project Site Geotechnical Exploration Report.

  • Subtask 2-2 Geotechnical Exploration & Phase I ESA’s Objective: Provide subsurface soil exploration for the purposes of project function.

  • Prior to commencing any trenching or excavations, the Developer shall, taking into account the information in the Project Site Geotechnical Exploration Report, the Underground Utility Survey and in compliance with Good Design-Build Practice, conduct further site investigations, including exploratory excavations and further borings, to confirm the location and type of underground structures that could be damaged as a result of the excavations.

  • XXXXXX & ASSOCIATES SUBCONSULTANT FEE Exhibit "C" April 19, 2017 Xx. Xxxxx Xxxxxx, PE HDR 00 Xxxx Xxxxx Xxxxxx, Xxxxx #000 Pensacola, Florida 33502 SUBJECT: Revised Geotechnical Exploration and Phase 1 ESA Proposal Delano Area Drainage Projects Pensacola, Florida Dear Xx. Xxxxxx: Xxxxx X.

  • These sections are as follows: o Geotechnical Exploration Study for the pavement and drainage improvements.

  • The Lessee must provide the Lessor and NMFS with reports every 90 calendar days following the commencement of HRG Survey and/or Geotechnical Exploration activities, and a final report at the conclusion of the HRG Survey and/or Geotechnical Exploration activities.

  • ASTM D6151-08, Standard Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling, 2008.

  • Geotechnical Exploration Survey Field survey of exploration locations and elevations will be performed within the Project area.

  • Xxxxxxxx Street, Suite 2 Xxxxxx Telephone: Fax: Email: 000-000-0000 000-000-0000 xxxxxxx@xxxxxxxxxxxxxx.xxx State: Telephone: Fax: GA 000-000-0000 Zip: 30720 Email: Xxxxx.Xxxxxxxxxxx@xxx-xx.xxx PROJECT INFORMATION Project Name: Project Location: Mill Creek Riverwalk - Geotechnical Exploration Dalton, Georgia SERVICES TO BE RENDERED Proposal Number: 14-21312 Dated: May 7, 2021 is incorporated into this Agreement For Services.

  • Geotechnical Exploration Proposal Eleven Mile Creek Flood Plain February 2, 2017 ▼ Subsurface soils encountered and soil classifications.

Related to Geotechnical Exploration

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Exploration means all activities directed toward ascertaining the existence, location, quantity, quality or commercial value of deposits of Products.

  • Exploration Operations means operations conducted in the Contract Area pursuant to this Contract in searching for Petroleum and in the course of an Appraisal Programme and shall include but not be limited to aerial, geological, geophysical, geochemical, palaeontological, palynological, topographical and seismic surveys, analysis, studies and their interpretation, investigations relating to the subsurface geology including structural test drilling, stratigraphic test drilling, drilling of Exploration Xxxxx and Appraisal Xxxxx and other related activities such as surveying, drill site preparation and all work necessarily connected therewith that is conducted in connection with Petroleum exploration.

  • exploration area means that part of the Area allocated to the Contractor for exploration, described in schedule 1 hereto, as the same may be reduced from time to time in accordance with this contract and the Regulations;

  • drilling means the act of boring a hole to reach a proposed bottom hole location through which oil or gas may be produced if encountered in paying quantities, and includes redrilling, sidetracking, deepening, or other means necessary to reach the proposed bottom hole location, testing, logging, plugging, and other operations necessary and incidental to the actual boring of the hole;

  • Engineering means the application of scientific knowledge for the design, control, or use of building structures, equipment, or apparatus.

  • Exploration Well means a well that is not a development well, a service well or a stratigraphic test well.

  • Value Engineering means the detailed analysis of systems, equipment, materials, services, facilities, and supplies required by the Contract Documents for the purpose of achieving the desired and essential functions of the Owner’s program at the lowest cost consistent with required and necessary performance, longevity, reliability, quality and safety.

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Systems Engineering means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Engineering control means the use of substitution, isolation, ventilation, and equipment modification to reduce exposure to SARS-CoV-2 virus and COVID-19 disease related workplace hazards and job tasks.

  • Mines means those devices defined in Article 2, Paragraphs 1, 4 and 5 of Protocol II annexed to the Convention on Prohibitions and Restrictions on the Use of Certain Conventional Weapons Which May Be Deemed to Be Excessively Injurious or to Have Indiscriminate Effects of 1980.

  • Mining means the mining, extracting, producing, beneficiating, handling, milling or other processing of Products.

  • Structural Engineer means the Engineer appointed or to be appointed from time to time by Promoter for the preparation of the structural design and drawings of the buildings .

  • engineering services means infrastructure for –

  • Development Area means that area to which a development plan is applicable.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • exploration licence means an exploration licence under Part 2 of the Mineral Resources Development Act 1990; S. 3(1) def. of "fish" inserted by No. 40/2002 s. 3(a).

  • experimental development means acquiring, combining, shaping and using existing scientific, technological, business and other relevant knowledge and skills with the aim of developing new or improved products, processes or services. This may also include, for example, activities aiming at the conceptual definition, planning and documentation of new products, processes or services;

  • Architect/Engineer (A/E means a person registered as an architect pursuant to Tex. Occ. Code Ann., Ch. 1051, as a landscape architect pursuant to Tex. Occ. Code Ann., Ch. 1052, a person licensed as a professional engineer pursuant Tex. Occ. Code Ann., Ch. 1001, and/or a firm employed by Owner or Design-Build Contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Geotechnical report or "geotechnical analysis" means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. Geotechnical reports shall conform to accepted technical standards and must be prepared by qualified professional engineers or geologists who have professional expertise about the regional and local shoreline geology and processes.

  • Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.

  • Petroleum Operations means, as the context may require, Exploration Operations, Development Operations or Production Operations or any combination of two or more of such operations, including construction, operation and maintenance of all necessary facilities, plugging and abandonment of Xxxxx, safety, environmental protection, transportation, storage, sale or disposition of Petroleum to the Delivery Point, Site Restoration and any or all other incidental operations or activities as may be necessary.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Environmental Consultant has the meaning set forth in Section 5.17(a).