Examples of Generation Project in a sentence
The Scheduled Energized Date shall be the date that is twelve (12) months from the Trade Date of such Product Order if the Designated System is a Distributed Renewable Energy Generation Device, or eighteen (18) months from the Trade Date of such Product Order if the Designated System is a Community Renewable Energy Generation Project.
Additionally, if there is an increase in the Collateral Requirement for a Community Renewable Energy Generation Project based on information in Seller’s ABP Part I Application and ABP Part II Application for such Designated System, Seller shall not be required to post additional Performance Assurance Amount at the time of Energization.
Borrower intends to develop, construct, install, test, own, operate and use an approximately MW electric generating facility located , known as the Generation Project (the “Project”).
Unless extended pursuant to Section 2.4(b), the Scheduled Energized Date shall be the date that is twelve (12) months from the Trade Date of such Product Order if the Designated System is a Distributed Renewable Energy Generation Device, or eighteen (18) months from the Trade Date of such Product Order if the Designated System is a Community Renewable Energy Generation Project.
For avoidance of doubt, with respect to a Designated System that is a Community Renewable Energy Generation Project, the Designated System Contract Maximum REC Quantity and the Delivery Year Expected REC Quantities shall be adjusted pursuant to Section 2.6(b) and Section 2.6(c) and the updated Schedule B and REC Delivery schedule will be issued by the IPA to Buyer and Seller pursuant to Section 2.6(g).
Notwithstanding the foregoing, if there is an increase in the Collateral Requirement for a Community Renewable Energy Generation Project in the quarterly payment adjustments pursuant to Sections 2.6(a)-(b), Seller shall not be required to post additional Performance Assurance Amount at the time of such payment adjustment(s).
Generation Project Developer shall ensure the primary frequency response capability of its Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls.
To the extent that a Generation Project Developer uses distribution facilities for the purpose of delivering energy to the Transmission System, Interconnection Service under this Tariff shall include the construction and/or use of such distribution facilities.
Whenever the Generating Facility is operated in parallel with the Transmission System, Generation Project Developer shall operate the Generating Facility with its governor or equivalent controls in service and responsive to frequency.
Instantaneous, bi-directional real power and, with respect to a Generation Project Developer’s Generating Facility or Merchant Transmission Facility, reactive power flow information, must be telemetered directly to the location(s) specified by Transmission Provider and the Transmission Owner.