Examples of FPSO in a sentence
However just a day before FPSO loading date, the tanker will have to first berth at Kakinada Port to facilitate safe transfer of Mooring Team and Surveyor on board of Off-take Tanker.
The measurement of the Custody Transfer Quantity of Crude Oil, Sampling and Testing of the quality shall be carried out as under: Wet Quantity of crude oil delivered shall be measured through the mass flow meters / ultrasonic meters/ Turbine flow meters installed by the Seller at FPSO.
If meters installed at FPSO are not working, marine vessel dip reading with applicable VEF shall be used for calculation of dry crude oil volume.
Then the same tanker will proceed to FPSO AS V with Mooring Team and Surveyor.
The Parameters given above are from Load Port for Latest cargo from FPSO AS-V ( M field KG-DWN-98/2 block).