Examples of Forward Capacity Auction in a sentence
Seller shall participate in such Forward Capacity Auction qualification process as required to allow Seller to qualify a Seasonal Claimed Capability of not less than 1,090 MW over the U.S. Transmission Line no later than the Guaranteed Delivery Term Start Date, as it may be extended pursuant to Sections 3.1(c) through 3.1(f).
For the avoidance of doubt, but without limiting the condition set forth in Section 3.4(b)(ii), Seller shall have no obligation during the Services Term to pay for such Network Upgrades or to complete the Forward Capacity Auction qualification process.
The Provider shall sell the capacity of the Project into the Forward Capacity Market (FCM) by the later of twelve (12) months from the Commercial Operation Date or the first date available to participate in the Forward Capacity Auction (FCA); if not, the Provider relinquishes ownership of the Capacity Value of the Project to the Host.
Capacity Network Resource Group Study (“CNR Group Study”) – The study performed by the System Operator under Section III.13.1.1.2.3 of the Tariff to determine which resources qualify to participate in a Forward Capacity Auction.
Capacity Network Resource Group Study (“CNR Group Study”) shall mean the study performed by the System Operator under Section III.13.1.1.2.3 of the Tariff to determine which resources qualify to participate in a Forward Capacity Auction.
List Bid is a bid that may be submitted in a Forward Capacity Auction by certain Existing Generating Capacity Resources subject to a multi-year contract to sell capacity outside of the New England Control Area during the associated Capacity Commitment Period, as described in Section III.13.1.2.3.1.4 of Market Rule 1.
Capacity Supply Obligation is an obligation to provide capacity from a resource, or a portion thereof, to satisfy a portion of the Installed Capacity Requirement that is acquired through a Forward Capacity Auction in accordance with Section III.13.2, a reconfiguration auction in accordance with Section III.13.4, or a Capacity Supply Obligation Bilateral in accordance with Section III.13.5.1 of Market Rule 1.
Composite FCM Transaction is a transaction for separate resources seeking to participate as a single composite resource in a Forward Capacity Auction in which multiple Designated FCM Participants provide capacity, as described in Section III.13.1.5 of Market Rule 1.
In the event that (i) the Facility is ineligible to participate in the ISO-NE Forward Capacity Market due to the location of the Facility or to due to a change in ISO-NE Rules or ISO-NE Practices, or (ii) notwithstanding Seller’s good faith efforts to participate in the applicable Forward Capacity Auction and/or reconfiguration auction, the Facility fails to clear with a Capacity Supply Obligation, then in either case Capacity payments per Exhibit E shall be suspended.
Existing Capacity Resource is any resource that does not meet any of the eligibility criteria to participate in the Forward Capacity Auction as a New Capacity Resource.