Footpath Works definition

Footpath Works means those concrete footpath strips and other works to be completed in the Footways in accordance with the PDA Development Approval and any other legal requirements.
Footpath Works means that Item of the Works numbered 2 in Schedule 3. Force Majeure Event means any event or circumstance, or a combination of events or circumstances:
Footpath Works means those parts of the Public Benefit described as “Footpath Works” in clause 1 of Schedule 3, to be delivered by the Developer in accordance with this document.

Examples of Footpath Works in a sentence

  • That the project is funded from savings held in the infrastructure reserve and by deferring the following three projects: Old South Head Road – Footpath Works; Vaucluse Road – Road Infrastructure Works; and Hopetoun Avenue & The Crescent – Stormwater Improvement Works, from the 2011/12 Capital Works Program to 2012/13.

  • A 21-signature petition has been received from Duncraig residents strongly opposing any proposed installation of a footpath in Kenny Drive, Duncraig as part of the 2003/2004 Capital Works Program – Footpath Works.

  • The Government contends that the district court properly allowed Quindoza to testify as a fact witness.

  • Until the expiry of the Defects Liability Period, the City may retain from the Guarantee an amount equal to 10% of the Attributed Value of the Footpath Works as security for the Developer’s performance of its obligations under this clause 10.

  • The Developer must ensure that the Footpath Works reach Completion on or before the date or other milestone referred to in Column 3 in the table in clause 1 of Schedule 3 of this document in respect of the Footpath Works.

  • The Developer must, at its cost, obtain all relevant approvals and consents for the Footpath Works, whether from the City or from any other relevant Government Agency, including any necessary road opening permits.

  • There are no conditions in Virginia Code under which a CNS may practice without a practice agreement NP - §§ 54.1-2957(C) & (D) and 54.1-2957.01(B) An NP not qualified for autonomous practice shall maintain appropriate collaboration and consultation with at least one patient care team physician, as evidenced in a written or electronic practice agreement which is periodically reviewed and revised.

  • To award a short term works contract for the Footpath Works at Charter Green to London Surfacing.

  • An 11-signature petition has been received from Mullaloo residents strongly opposing any proposed installation in Johnson Crescent, Mullaloo as part of the 2003/2004 Capital Works Program – Footpath Works.

  • Before commencing the Footpath Works, the Developer must give to the City copies of all approvals and consents for the Footpath Works, other than the Development Consent.


More Definitions of Footpath Works

Footpath Works means the following works to existing public Footpaths and rights of way in the vicinity of the Development: (i) the provision of a permeable all- weather surface along an agreed section of footpath 736 adjacent to the western boundary of the Site between the Site and Rectory Road, coupled with improved signage and to include internal link path to the Site boundary as shown shaded xxxxx and labelled “footpath link to public right of way” on Plan 2 (or such revision thereto as may be approved in writing by the Council and the County Council) said works to be in accordance with the requirements of the Hampshire County Council Countryside Services Design Standards for Countryside Paths 2013;

Related to Footpath Works

  • footpath means a road over which there is a public right of way for pedestrians only, not being a footway;

  • The Works/Project means the works to be executed or done under this contract.

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Home improvement means the remodeling, altering,

  • Sewage works means all facilities for collecting, pumping, treating, and disposing of sewage.

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Work/ works means work / works to be executed in accordance with the contract.

  • The Works/ Project means the works to be executed or done under this contract.

  • Nail technician means any person who for compensation manicures or pedicures natural nails, or who performs artificial nail services for compensation, or any combination thereof.

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.  Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.

  • Non-Public Works and Improvements means all competitively solicited procurement of Supplies and/or Services by the City not solicited as Public Works.

  • Pavement means any type of improved surface that is within the public right-of-way and that is paved or otherwise constructed with bituminous, concrete, aggregate, or gravel.

  • Building Project means the aggregate combined parcel of land on a portion of which are the improvements of which the Premises form a part, with all the improvements thereon, said improvements being a part of the block and lot for tax purposes which are applicable to the aforesaid land.

  • Work area means a room or defined space in a workplace where hazardous chemicals are produced or used, and where employees are present.

  • The Works means the work or works to be executed or done under this contract.

  • Private Improvements means the improvements to be constructed on the Property that are not Public Improvements.

  • Installation Works means, as the context so requires,

  • Minor Works has the meaning given to it in paragraph 2.7(a) of Schedule 4 (Persons with Disabilities and Disability Discrimination);

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Critical infrastructure means existing and proposed systems and assets, whether physical or virtual, the incapacity or destruction of which would negatively affect security, economic security, public health or safety, or any combination of those matters.++

  • Mixed use development means a Building used, designed or intended for Residential and Non-Residential uses, where:

  • Plant and materials means: The Plant and materials in respect of which an advance payment prior to manufacture is required, which the City of Cape Town has agreed may be subject to advance payment, such Plant and materials being listed in the Schedule of Plant and materials.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.