Flood Management Project definition

Flood Management Project means a project that will alter, modify or change the base flood elevation of a 1% annual chance flood event.
Flood Management Project means a project that will alter, modify or change the base flood eleva tion of a 1% annual chance flood event.

Examples of Flood Management Project in a sentence

  • The Oyo State Government is being supported by the World Bank to implement the Ibadan Urban Flood Management Project (IUFMP) that aims at developing a long-term flood risk management framework.

  • The development objective of the Metro Manila Flood Management Project is to improve flood management in selected areas of Metro Manila.

  • Specifically, the DPC was aligned with the following two high-level objectives of the Government’s strategy: (i) human development, reduction of inequalities and social protection, and (ii) a transparent and modern state.

  • The Metro Manila Flood Management Project will have significant benefits in reducing flood risk and damage to residents and property along waterways.

  • The increasing emphasis on using natural solutions to hold back and slow water down upstream of where it can have a negative impact has been significantly bolstered by the commencement of the Worcestershire Natural Flood Management Project.

  • To enable these areas to be developed the Bath Quays Waterside Project ( Flood Management Project) has been devised.

  • The Metro Manila Flood Management Project is one of the three key elements of the Master Plan to address drainage issues in Metro Manila.

  • A vehicle may temporarily use a space reserved for a mobility-impaired individual without a mobility-impaired certificate for the purpose of loading and unloading a mobility-impaired individual.

  • Possible action to accept the report and provide direction to staff related to Truckee River Flood Management Project scheduling and funding items as set forth in the report.

  • The Government of India has received for financing from the World Bank & AIIB toward the cost of the West Bengal Major Irrigation and Flood Management Project (WBMIFMP) Project and intends to apply part of the proceeds toward eligible payments under the contract1 for construction of works as detailed below.

Related to Flood Management Project

  • Tidal Flood Hazard Area means a flood hazard area in which the flood elevation resulting from the two-, 10-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.

  • Special Flood Hazard Area means an area that FEMA’s current flood maps indicate has at least a one percent (1%) chance of a flood equal to or exceeding the base flood elevation (a 100-year flood) in any given year.

  • Load Management means a Demand Resource (“DR”) as defined in the Reliability Assurance Agreement.

  • Area of special flood hazard means the land in the flood plain within a community subject to a one percent or greater chance of flooding in any given year.

  • Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see definition of “flood”).

  • Affordable housing project means, for purposes of this part, title fourteen of article twenty seven of the environmental conservation law and section twenty-one of the tax law only, a project that is developed for residential use or mixed residential use that must include affordable residential rental units and/or affordable home ownership units.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Flood Program means the National Flood Insurance Program created by the U.S. Congress pursuant to the National Flood Insurance Act of 1968, the Flood Disaster Protection Act of 1973, the National Flood Insurance Reform Act of 1994 and the Flood Insurance Reform Act of 2004, in each case as amended from time to time, and any successor statutes.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Flood proofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Lead hazard means any substance, surface or object that contains lead and that, due to its condition, location or nature, may contribute to the lead poisoning or lead exposure of a child under 6 years of age.