FERC Order 745 Costs definition

FERC Order 745 Costs means any costs or charges imposed by the ISO in accordance with complying with the provisions of Federal Energy Regulatory Commission (“FERC”) in Order No. 745 18 CFR Part 35 (March 15, 2011). Any modifications or conditions to the treatment of FERC Order 745 Costs under the ISO tariff or otherwise shall be deemed a change in law pursuant to Section 5 of the General Terms and Conditions of this Agreement.

Examples of FERC Order 745 Costs in a sentence

  • Notice of Change of AuditorUnder NI 51-102 (Section 4.11) To: Ontario Securities CommissionBritish Columbia Securities Commission Alberta Securities Commission And to: Ernst & Young LLP KPMG LLPRe: Notice of Change of Auditor TAKE NOTICE THAT:Pursuant to National Instrument 51-102 Continuous Disclosure Obligations, DEALNET CAPITAL CORP.

  • Any modifications or conditions to the treatment of FERC Order 745 Costs under the ISO OATT or otherwise shall be deemed a change in law pursuant to Section 5 of the General Terms and Conditions of this Agreement.

  • Energy Costs Fixed Ancillary Services And Other ISO Costs Fixed Capacity Costs Fixed Line Loss Costs Fixed FERC Order 745 Costs Fixed Renewable Portfolio Standard Costs Fixed CES Costs Fixed The Contract Prices contained in the Account Schedule have been reduced to reflect a Fixed credit to Participant for the Auction Revenue Rights and Transmission Loss Credits associated with the Account(s).

  • This subchapter is necessary to protect the health and safety of the citizens of this State.

  • This price includes Energy Costs, Ancillary Services and Other ISO Costs, Auction Revenue Rights Credits, Capacity Costs, NITS Costs, Transmission Enhancement Costs, Transmission Loss Credits, Line Loss Costs, FERC Order 745 Costs, Balancing Congestion Costs, Transmission Reallocation Costs.

  • Energy Costs Fixed Ancillary Services And Other ISO Costs Fixed Auction Revenue Rights Credits Fixed Capacity Costs Passed Through Transmission Costs Passed Through Transmission Loss Credits Fixed Line Loss Costs Fixed FERC Order 745 Costs Fixed The contract prices contained in the Account Schedule include credit costs and margin as well as Renewable Portfolio Standards Costs.

  • Energy Costs Fixed Ancillary Services And Other ISO Costs Fixed Capacity Costs Fixed Line Loss Costs Fixed NE-ISO Demand Response Settlement Costs/ FERC Order 745 Costs N/A Renewable Portfolio Standards Costs Fixed CES Costs Fixed The contract prices contained in the Account Schedule have been reduced to reflect a fixed credit to you for the Auction Revenue Rights and Transmission Loss Credits associated with the Account(s).

  • Additionally, measures of parental depression, anxiety and stress will be assessed with survey-based tools at 2 and 4 months.

  • The sec- ond step in SAX is to discretize the PAA reduction into symbols.

  • Energy Costs Fixed Ancillary Services And Other ISO Costs Fixed Capacity Costs Fixed Transmission Costs Fixed Line Loss Costs Fixed RMR Costs Fixed FERC Order 745 Costs Fixed Balancing Congestion Costs Fixed Transmission Reallocation Costs Fixed The contract prices contained in the Account Schedule have been reduced to reflect a fixed credit to you for the Auction Revenue Rights and Transmission Loss Credits associated with the Account(s).

Related to FERC Order 745 Costs

  • Response Costs means all costs, including, but not limited to, direct and indirect costs, that the United States incurs in monitoring and supervising Respondents’ performance of the Work to determine whether such performance is consistent with the requirements of this Order, including costs incurred in reviewing deliverables submitted pursuant to this Order, as well as costs incurred in overseeing implementation of this Order, including, but not limited to, payroll costs, contractor costs, travel costs, and laboratory costs.]

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Fee and Expense Application means the motion to be filed by Class Counsel, in which they will seek approval of an award of attorneys’ fees, costs, and expenses, as well as an Incentive Award for the Class Representative.

  • Sewage Treatment Plant means any arrangement of devices and structures used for treating sewage.

  • Routine patient care costs means Covered Medical Expenses which are typically provided absent a clinical trial and not otherwise excluded under the Policy. Routine patient care costs do not include:

  • Transportation Costs means a component of the Charges, comprising those charges payable to the TNO and/or DNO for the use of their networks as applicable from time to time under the Industry Agreements including those charges more specifically referred to as “DUoS” and “TNUoS” and specified as “Included in the Unit Rate”, “Fixed” or “Pass-Through” in the Quotation Document or as otherwise notified to you as payable during the Supply Contract from time to time;

  • Manual Load Dump Action means an Operating Instruction, as defined by NERC, from PJM to shed firm load when the PJM Region cannot provide adequate capacity to meet the PJM Region’s load and tie schedules, or to alleviate critically overloaded transmission lines or other equipment. Manual Load Dump Warning:

  • NERC Interchange Distribution Calculator means the NERC mechanism that is in effect and being used to calculate the distribution of energy, over specific transmission interfaces, from energy transactions.

  • Gasoline dispensing facility means any site where gasoline is dispensed to motor vehicle gasoline tanks from stationary storage tanks.

  • Certified Remanufacture System or Verified Engine Upgrade means engine upgrades certified or verified by EPA or CARB to achieve a reduction in emissions.

  • Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Bondable stranded costs rate order means one or more

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.