Estimated Cost of the Work definition

Estimated Cost of the Work. ’ (ECW) means the estimated direct cost of the construction work. The proposed ECW incorporated at construction contract award is the target ECW. The final ECW is negotiated during the design phase and is incorporated into the construction contract through modification.
Estimated Cost of the Work. ’ (ECW) means the estimated direct cost of the construction work.
Estimated Cost of the Work means the Cost of the Work as estimated and contained in a cost estimate prepared by the Architect/Engineer or, as applicable, the Construction Manager. In preparing the Estimated Cost of Work, the Architect/Engineer or Construction Manager, as applicable, shall be permitted to include contingencies for design, bidding and price escalation, and to include in the Construction Documents alternate bids as may be necessary to adjust the actual Cost of the Work to meet the College’s budget.

Examples of Estimated Cost of the Work in a sentence

  • The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est.

  • Preconstruction Fee + CM/GC Fee + Estimated Cost of the Work (Est.

  • COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.

  • Provide your firm's CM/GC Fee as a percentage of the Estimated Cost of the Work for this Project.

  • Upon EPA’s acceptance of a reduction in the amount of the performance guarantee, the Estimated Cost of the Work shall be deemed to be the estimated cost of completing the Work set forth in EPA’s written decision.

  • Upon EPA’s approval, the Estimated Cost of the Work shall be deemed to be the estimate of the cost of the remaining Work in the approved proposal.

  • Assets located in the United States amounting to at least 90 percent of total assets or at least six times the sum of the Estimated Cost of the Work and the amounts, if any, of other federal, state, or tribal environmental obligations financially assured through the use of a financial test or guarantee; orThe affected Respondent or guarantor has:i.

  • Tangible net worth at least six times the sum of the Estimated Cost of the Work and the amounts, if any, of other federal, state, or tribal environmental obligations financially assured through the use of a financial test or guarantee; and iii.

  • COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, the Fixed Cost for GC Work, and the costs of all components and systems required for a complete, fully functional facility.

  • To the extent that the fixed Cost of the Work is less than the Estimated Cost of the Work for a respective line item, such line item shall be reduced, and the Construction Contingency increased accordingly.


More Definitions of Estimated Cost of the Work

Estimated Cost of the Work means the estimated value of the project as determined by the Chief Building Official.
Estimated Cost of the Work shall have the meaning set forth in the Consent Decree.
Estimated Cost of the Work. (ECW) means the estimated direct cost of the construction work. The proposed ECW incorporated at construction contract award is the target

Related to Estimated Cost of the Work

  • Cost of the Work means costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rates not higher than those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 6.

  • Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;

  • Estimated Costs means costs estimated by the Authority as likely to be:

  • Cost of the Project means and embraces the cost of construction; the cost of all

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • estimated consumption means the consumption that a customer, whose consumption is not measured during a specific period, is deemed to have consumed and that is estimated by taking into account factors that are considered relevant by the Municipality and which may include the consumption of municipal services by the totality of the users of a service within the area where the service is rendered by the Municipality, at the appropriate level of service, for a specific time;

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • Manufacturing Cost means [***].

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Start-Up Costs means all fees, costs, and expenses incurred in connection with establishing the State Mitigation Trust and the Indian Tribe Mitigation Trust and setting them up for operation. Start-up costs shall not include the cost of premiums for insurance policies.

  • Cost of work , in table above, shall mean the agreement amount of the work.

  • Routine Patient Costs means all health care services that are otherwise covered under the Group Contract for the treatment of cancer or other Life-threatening Condition that is typically covered for a patient who is not enrolled in an Approved Clinical Trial.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Direct Costs means the sum of the following:

  • Project Expenses means usual and customary operating and financial costs. The term does not include extraordinary capital expenses, development fees and other non-operating expenses.

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Related Costs means lodging and, if necessary, physical protection for the Covered Person during or while waiting for Transport to the Nearest Place of Safety. Related Costs will include temporary lodging, if necessary, while a Covered Person is waiting to be transported back to the Host Country, Home Country or other country where the Policyholder that sponsored the Covered Person’s Trip is located. Benefits will not be payable for Related Costs unless We (or Our authorized assistance provider) authorize in writing, or by an authorized electronic or telephonic means, all expenses in advance, and services are rendered by Our assistance provider.

  • Total Project Cost means the lowest of the following:

  • Cost of Services is FASC’s total Operating Costs incurred in providing the applicable Category of Services during the month to all investment advisers for which FASC provides that Category of Services. “Adviser’s Assets under Management” is the total average assets under management for the month for all Accounts or portions thereof for which the Adviser acts as investment adviser or subadvisor and which utilize the Category of Services.

  • Actual Cost means the cost of depleted supplies, records storage media costs, actual mailing and alternative delivery costs, or other transmitting costs, and any direct equipment operating and maintenance costs, including actual costs paid to private contractors for copying services.