Decommissioning Project definition

Decommissioning Project means each individual decommissioning, plugging and abandonment project with respect to the Facilities.
Decommissioning Project means a defined scope of works undertaken by, or on behalf of, the offshore hydrocarbons production asset owner, designed to remove all or part of the asset infrastructure after the asset has permanently ceased production.

Examples of Decommissioning Project in a sentence

  • The facility is now referred to as the Hematite Decommissioning Project (HDP).

  • Biosolids Recycling Facility Vitrification System Decommissioning Project Status Report.

  • Send us a photo of your soil texture experiment.Soil SizesAll soils are made of three basic particle sizes.

  • The Kinsale Area Decommissioning Project will ensure minimum impact on the environmental and residual risks and liabilities will be managed appropriately.

  • Pursuant to the terms of these Petroleum Leases, a plan of development was submitted and agreed with the then Minister in respect of each of Kinsale Head and Seven Heads.The Kinsale Area gas fields and facilities are coming to the end of their productive life and Kinsale Energy is now preparing Decommissioning Plans setting out the proposals for the decommissioning of the Kinsale Area facilities (the Kinsale Area Decommissioning Project, “KADP”).

  • Exh 8 (PG&E/Sharp) and Exh 5 (PG&E/Sharp) at: Attachment B 2012 and 2016 Humboldt Bay Power Plant Unit 3 Decommissioning Project Report Costs Comparison Table; Table 4-1 2012 NDCTP Cost Estimates.

  • PG&E’s remaining work to complete decommissioning includes overseeing the CWC activities, cost control and accounting, disposal of wastes and management of SNF and GTTCC waste.41The 2016 Decommissioning Project Report (DPR) for the HBPP, prepared by PG&E, sets forth the remaining activities, costs and schedule to complete HBPP decommissioning and license termination.42 This report updates the prior HBPP Decommissioning Project Report 2012-2025 (2012 DPR) submitted in the 2012 NDCTP.

  • This analysis reflects lessons learned from TLG’s involvement in the Shippingport Station Decommissioning Project, completed in 1989, as well as the decommissioning of the Cintichem reactor, hot cells, and associated facilities, completed in 1997.

  • Weiss,Director, Non-Power Reactors and Decommissioning Project Directorate,Division of Reactor Program Management, Office of Nuclear Reactor Regulation.[FR Doc.

  • The options for pipeline and umbilical decommissioning were subject to a number of technical and environmental studies, including a Comparative Assessment (Kinsale Area Decommissioning Project Comparative Assessment Report 253993- 00-REP-08).

Related to Decommissioning Project

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Redevelopment project means any work or undertaking

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • New Project means (a) each facility which is either a new facility, branch or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, branch or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Project area budget means a multiyear projection of annual or cumulative

  • Project area plan means a written plan that, after the plan's effective date, guides and controls the development within a project area.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Project Work means the work required to complete the Project.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Development Project means a project for the development of land within a

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Project site, where applicable, means the place indicated in bidding documents.

  • Building Project means the aggregate combined parcel of land on a portion of which are the improvements of which the Premises form a part, with all the improvements thereon, said improvements being a part of the block and lot for tax purposes which are applicable to the aforesaid land.

  • The Works/Project means the works to be executed or done under this contract.

  • Ongoing Project means a multi-year project undertaken by a Company in fulfilment of its CSR obligation having timelines not exceeding three years excluding the financial year in which it was commenced, and shall include such project that was initially not approved as a multi-year project but whose duration has been extended beyond one year by the board based on reasonable justification;