Date of Final Interconnection Approval definition

Date of Final Interconnection Approval means, with respect to a Designated System, the date recorded in Schedule B to the Product Order that is applicable to such Designated System as determined by the IPA as the date such Designated System received its approval to interconnect by the applicable electric utility approving the interconnection request.

Examples of Date of Final Interconnection Approval in a sentence

  • Each such Designated System is a new generating unit such that the Date of Final Interconnection Approval did not occur before June 1, 2017.

  • Seller, as transferor of the RECs, shall confirm the Standing Order request within the PJM-EIS GATS or M-RETS within thirty (30) days of the later of: the Project’s Date of Final Interconnection Approval or June 1, 2022.

  • Seller or a designee of Seller, as transferor of the RECs, shall confirm the Standing Order request within the PJM EIS GATS or M-RETS within thirty (30) days of the later of: the Designated System’s Date of Final Interconnection Approval or the Trade Date of the Product Order that includes the Designated System.

  • Seller or a designee of Seller, as transferor of the RECs, shall confirm the Standing Order request within the PJM-EIS GATS or M-RETS within thirty (30) days of the later of: the Designated System’s Date of Final Interconnection Approval or the Trade Date of the Product Order that includes the Designated System.

  • Seller or a designee of Seller, as transferor of the RECs, shall confirm the Standing Order request within the PJM-EIS GATS or M-RETS within thirty (30) days of the later of: the Designated System’s Date of Final Interconnection Approval or the Trade Date of the Product Order that includes the Designated System (or as soon as practicable in the case of a resumption of Delivery obligations under this Agreement following a Suspension Period, if applicable).

  • In response, the Federal Reserve (Fed) initiated a variety of emergency unconventional measures to stabilize the global economy.

  • As required by Section 1-75(c)(1)(K) of the IPA Act, each such Designated System is a new generating unit such that the Date of Final Interconnection Approval did not occur before June 1, 2017.

Related to Date of Final Interconnection Approval

  • Optional Interconnection Study means a sensitivity analysis of an Interconnection Request based on assumptions specified by the Interconnection Customer in the Optional Interconnection Study Agreement.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Optional Interconnection Study Agreement means the form of agreement for preparation of an Optional Interconnection Study, as set forth in Tariff, Attachment N-3. Part I:

  • Provisional Interconnection Service means interconnection service provided by Transmission Provider associated with interconnecting the Interconnection Customer’s Generating Facility to Transmission Provider’s Transmission System and enabling that Transmission System to receive electric energy and capacity from the Generating Facility at the Point of Interconnection, pursuant to the terms of the Interconnection Service Agreement and, if applicable, the Tariff.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • Local Interconnection Trunks/Trunk Groups means the trunks that are used for the termination of Local Exchange Traffic, pursuant to iconectiv Technical Reference GR 317-CORE.

  • Local Interconnection Trunks/Trunk Groups means the trunks that are used for the termination of Local Exchange Traffic, pursuant to iconectiv Technical Reference GR 317-CORE.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Generating Market Buyer means an Internal Market Buyer that is a Load Serving Entity that owns or has contractual rights to the output of generation resources capable of serving the Market Buyer’s load in the PJM Region, or of selling energy or related services in the PJM Interchange Energy Market or elsewhere. Generation Capacity Resource:

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • PJM Interconnection, L.L.C. or "PJM" means the privately-

  • New Services Queue Closing Date means each April 30 and October 31 shall be the Queue Closing Date for the New Services Queue comprised of Interconnection Requests, Completed Applications, and Upgrade Requests received during the six-month period ending on such date. New York ISO or NYISO: “New York ISO” or “NYISO” shall mean the New York Independent System Operator, Inc. or any successor thereto.

  • Certificate of Final Completion means the certificate issued by A/E that documents, to the best of A/E’s knowledge and understanding, Contractor’s completion of all Contractor’s Punchlist items and pre-final Punchlist items, final cleanup and Contractor’s provision of Record Documents, operations and maintenance manuals, and all other closeout documents required by the Contract Documents.

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either:

  • Interconnection Service means the physical and electrical interconnection of the Customer Facility with the Transmission System pursuant to the terms of Tariff, Part IV and Tariff, Part VI and the Interconnection Service Agreement entered into pursuant thereto by Interconnection Customer, the Interconnected Transmission Owner and Transmission Provider. Interconnection Service Agreement:

  • Reference Interconnection Offer or “RIO” means a document published by a service provider specifying terms and conditions on which the other service provider may seek interconnection with such service provider;

  • PJM EIS GATS means the PJM Environmental Information Services, Inc. Generation Attribute Tracking System.

  • Service Control Point (SCP) is the node in the common channel signaling network that accepts Queries for certain Database services. The SCP is a real time database system that receives Queries from service platforms, performs subscriber or application-specific service logic, and then sends a Response back to the Query-originating platform. Such service platforms can be Service Switching Points (SSPs) or other network nodes capable of properly formatting and launching Queries.

  • Redemption Application means an application by a Participating Dealer for the redemption of Units in Application Unit size (or whole multiples thereof) in accordance with the Operating Guidelines and the Trust Deed.

  • Interconnection is As Defined in the Act.

  • Interconnector means equipment used to link the electricity system of the State to electricity systems outside of the State;

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Date of filing means the date an applicant submits a noti- fication of intent or the date an applicant files an application, whichever is earlier.