Cost of Connecting definition

Cost of Connecting means the average of the Utility's costs for the same size service connection incurred during the preceding calendar year including, if provided by the Utility, the Service Pipe, Tap, and installation thereof or portions thereof; however, the Cost of Connecting shall not be applicable under Rule 10 of these Terms and Conditions for Sewage Disposal Service for those portions of such cost recovered from an Applicant by the Utility in the form of a Tap or similar charge.

Examples of Cost of Connecting in a sentence

  • This will take care of transportation, meeting space and incidental expenses3.0 Cost of Connecting EquipmentThis is the cost of all electrochemical and civil works for the equipment used to connect the user to the TCN grid.

  • Approximate Cost of Connecting to Sewer EXECUTIVE SUMMARY The State Water Resources Control Board (State Board) and the nine regional water quality control boards (regional boards) are responsible for implementing state and federal laws to protect the quality of California’s waters.

  • Table 9 Approximate Cost of Connecting to Sewer ItemUnit Cost# of UnitsTotal Cost Sewer Connection Fee$23,000/dwelling1$23,000Septic Abandonment Fee$300/tank1$300Pump & Fill Septic Tank$1,200/tank1$1,200Lateral Construction$115/foot30 feet14$3,450Total Cost/dwelling $27,950 The total cost indicated in Table 9, above, is the average cost, and it could be a significant burden for most property owners.

Related to Cost of Connecting

  • Cost of the Project means and embraces the cost of construction; the cost of all

  • Cost of the Work means costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rates not higher than those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 6.

  • Cross Connection means a jumper cable or similar connection provided pursuant to Collocation at the digital signal cross connect, Main Distribution Frame or other suitable frame or panel between (i) the Collocating Party’s equipment and (ii) the equipment or facilities of the housing party.

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • connecting sewer means a pipe owned by the municipality and installed by it for the purpose of conveying sewage from a drainage installation on a premises to a sewer beyond the boundary of those premises or within a servitude area or within an area covered by a way-leave or by agreement;

  • connecting point means the point at which the drainage installation joins the connecting sewer;

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Taximeter means any device for calculating the fare to be charged in respect of any journey in a hackney carriage or private hire vehicle by reference to the distance travelled or time elapsed since the start of the journey, or a combination of both; and

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Service Connection means all cables and equipment required to connect the supply mains to the electrical installation of the consumer at the point of supply;

  • Grid System means STU / MSEDCL power transmission system / distribution system through which Delivered Energy is evacuated and distributed.

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Constructed wetlands means areas intentionally designed and created to emulate the water quality improvement function of wetlands for the primary purpose of removing pollutants from stormwater.

  • Cost of Capital Improvement Projects means the costs of acquiring, constructing, reconstructing, expanding, improving and engineering Capital Improvement Projects, and related financing costs.

  • Water Service Connection (lateral) shall mean the pipes and fixtures used for the purpose of supplying any premises in the Municipality with water from the Corporation’s water distribution system that is located between the Corporation’s water main in the street and the street property line abutting the premises so supplied.

  • Connected piping means all underground piping including valves, elbows, joints, flanges, and flexible connectors attached to a tank system through which regulated substances flow. For the purpose of determining how much piping is connected to any individual UST system, the piping that joins two UST systems should be allocated equally between them.

  • Cost data means factual information concerning the cost of labor, material, overhead, and other cost elements which are expected to be incurred or which have been actually incurred by the contractor in performing the contract.

  • Cost of materials means the cost of components, parts or materials which are intended for the production, manufacturing or assembling of the goods bid for and which are not produced, manufactured or assembled in the factory where the production, manufacture or assembly of such goods occurs, including freight, landing costs, port charges, import duties and other import costs of such components, parts or materials and all costs in connection with the handling and transport thereof prior to delivery at that factory;