Coordination Drawings definition

Coordination Drawings means drawings prepared by Trade Contractor and its Subcontractors detailing the Trade Contractor Work and the coordination of Trade Contractor Work items among the Trade Contractor and various Subcontractors.
Coordination Drawings. Means Drawings, diagrams, schedules and other data specially prepared by the Contractor and one or more other contractors or Subcontractors coordinating one or more construction trades related to the Project. “Owner” Means Brooklyn Bridge Park Corporation d/b/a Brooklyn Bridge Park
Coordination Drawings means drawings prepared by Subcontractors detailing the Work and the coordination of Work items among the various Subcontractors.

Examples of Coordination Drawings in a sentence

  • Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

  • Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

  • Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data.

  • Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

  • Prepare and submit Coordination Drawings to COTR for review and approval as provided in "Coordination Drawings" Paragraph in "Submittals" Article of this Section.

  • Coordination Drawings: Before start of the Work, prepare Coordination Drawings for areas with limited space availability that necessitate maximum utilization of space for efficient installation of different components, and areas requiring coordination for installation of products and materials fabricated by separate entities.

  • Submit Coordination Drawings for integration of different construction elements.

  • Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

  • Division 01 Section "Project Management and Coordination" for submitting and distributing meeting and conference minutes and for submitting Coordination Drawings.

  • Coordination Drawings are Shop Drawings prepared by Contractor that detail the relationship and integration of different construction elements that require careful coordination during fabrication or installation.


More Definitions of Coordination Drawings

Coordination Drawings means drawings prepared by Trade Contractors detailing the Work and the coordination of Work items among the various Trade Contractors.
Coordination Drawings. Coordination Drawings are drawings showing equipment layouts that indicate the necessary offsets for all duct work, piping, conduit, and other items to clear space for all other trades and to maintain the required ceiling height and partition layouts. All Coordination Drawings, including sections through shafts, shall be at not less than 3/8-inch scale.
Coordination Drawings means drawings prepared by Construction Manager and its Subcontractors detailing the Construction Manager Work and the coordination of Construction Manager Work items among the Construction Manager and various Subcontractors.
Coordination Drawings. Means Drawings, diagrams, schedules and other data specially

Related to Coordination Drawings

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Working Drawings means the final working drawings approved by Landlord, as amended from time to time by any approved changes thereto, and “Work” means all improvements to be constructed in accordance with and as indicated on the Working Drawings, together with any work required by governmental authorities to be made to other areas of the Building as a result of the improvements indicated by the Working Drawings. Landlord’s approval of the Working Drawings shall not be a representation or warranty of Landlord that such drawings are adequate for any use or comply with any Law, but shall merely be the consent of Landlord thereto. Tenant shall, at Landlord’s request, sign the Working Drawings to evidence its review and approval thereof. After the Working Drawings have been approved, Tenant shall cause the Work to be performed in accordance with the Working Drawings.

  • Shop Drawings means drawings, submitted to the PHA by the Contractor, subcontractor, or any lower tier subcontractor, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract. The PHA may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • The DRAWINGS / MAPS means the drawing/map or drawings/maps mentioned in NIT and any modifications of them approved by the Employer or any further Working drawings/maps or sketches by the Employer or any further working drawings/maps or sketches which may be furnished or approved in writing by the Employer.

  • Shop Drawing means any and all drawings, diagrams, layouts, explanations, illustrations, manufacturer's drawings or other written or graphic materials which illustrate any portion of the construction work.

  • Non-Extension Drawing has the meaning specified in Section 3.5(d).

  • Space Plan herein means, to the extent required by the nature of the Work, detailed plans (including any so-called “pricing plans”), including a fully dimensioned floor plan and drawn to scale, showing: (i) demising walls, interior walls and other partitions, including type of wall or partition and height, and any demolition or relocation of walls, and details of space occupancy and density, (ii) doors and other openings in such walls or partitions, including type of door and hardware, (iii) electrical and computer outlets, circuits and anticipated usage therefor, (iv) any special purpose rooms, any sinks or other plumbing facilities, heavy items, and any other special electrical, HVAC or other facilities or requirements, including all special loading and related calculations, (v) any space planning considerations to comply with fire or other codes or other governmental or legal requirements, (vi) finish selections, and (vii) any other details or features requested by Architect, Engineer or Landlord, or otherwise required, in order for the Space Plan to serve as a basis for Landlord to approve the Work, and for Tenant to contract and obtain permits for the Work, or for the Space Plan to serve as a basis for preparing Construction Drawings.

  • First draw sample means a one−liter sample of tap water that has been standing in plumbing pipes at least 6 hours and is collected without flushing the tap.

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Design Documentation means all schematics and test, assembly and package documentation relating to the Product, including all design, specification and assembly documentation and data files for Materials, which is necessary for the production, manufacture, qualification, testing and delivery of the Product to be attached as Exhibit A.

  • Design-build team means an entity that consists of:

  • Tenant Improvements Defined in Exhibit B, if any.

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Architect means the person or other entity engaged by the PHA to perform architectural, engineering, design, and other services related to the work as provided for in the contract. When a PHA uses an engineer to act in this capacity, the terms “architect” and “engineer” shall be synonymous. The Architect shall serve as a technical representative of the Contracting Officer. The Architect’s authority is as set forth elsewhere in this contract.

  • TI means transport index (see 1.2.1);

  • Design Team means Architect and its Subconsultants as set forth in the Design Services Agreement.

  • Design Documents means, collectively and as applicable, the Conceptual Design Documents, Schematic Design Documents, the Design Development Documents and the Construction Documents prepared by the Trade Contractor.

  • Design Criteria Professional means a firm who holds a current certificate of registration under Chapter 481 of the Florida Statutes, to practice architecture or landscape architecture, or a firm who holds a current certificate as a registered engineer under Chapter 471 of the Florida Statutes, to practice engineering, and who is employed by or under contract to the District to provide professional architect services, landscape architect services, or engineering services in connection with the preparation of the Design Criteria Package.