Construction Division definition

Construction Division means the Construction Division of the Tennessee Department of Transportation.
Construction Division means each of the following branches of WESCO or Wesco Equity Corporation, as applicable: (a) Hicksville, (b) Parsippany, (c) Rochester, (d) Pittsburgh, (e) Las Vegas, (f) Avon Electrical Supply/Liberty Electric, (g) Manuxx xxx (h) [Nevada Electric Supply].
Construction Division shall have the meaning ascribed thereto in the recitals.

Examples of Construction Division in a sentence

  • The Prime Contractor shall furnish a letter to the NDOR Construction Division in Lincoln on company letterhead and signed by an officer of the company stating that documentation is on file certifying that the Contractor and all subcontractors have registered with and used a Federal Immigration Verification System.

  • Office Notice Board/ Divisional Accounts Officer / Estimating Section /Hd. Clerk / Cash Section of Lower Damodar Construction Division.

  • Copies of the specification book may be purchased from the MDOT Construction Division.

  • A copy of the report of tests will be distributed to the District and Construction Division.

  • The request must be made, in writing, to the NDR Construction Division within 60 days of awareness of sample results.

  • For off-line tenders of value from Rs 3.0 Lakh up to Rs 5.0 Lakh is to be tendered in a single bid system in off-line mode to be accepted by Executive Engineer-II, Lower Damodar Construction Division, I&W Directorate.

  • This is subject to either the CEPU (Electrical Division) and/or CFMEU (Construction Division) adopting such a position.

  • A copy of the report of tests will be distributed to the District, Construction Division, and Contractor.Dispute ResolutionAfter testing and investigations have been completed on the one can of the sample and there is still a dispute, the Department will select an independent laboratory for referee testing to take place on the second can of the sample.

  • The Vice Chancellor for Facilities, in consultation with the Director, Construction Division, GSFIC, shall make the final decision consistent with established State accounting policies and the Certificate shall be adjusted accordingly.

  • Tenderers are required to furnish Earnest Money amount in the form of Bank Draft/FDR/CDR of any scheduled bank duly pledged in favour of Executive Engineer, Electricity Urban Construction Division (III), LESA, Lucknow which should be submitted along with the tender bid Part-I.

Related to Construction Division

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • construction site means a workplace where construction work is being performed;

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Construction Work means any work in connection with⎯

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods:

  • Project Improvements means site improvements and facilities that are:

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Improvement completion assurance means a surety bond, letter of credit,

  • Construction materials means any tangible personal property that will be

  • Redevelopment project means any work or undertaking

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Development Project means a project for the development of land within a

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.