Construction Change Directives definition

Construction Change Directives means a written order directing the CMAR to perform additional Work to the CONTRACT when time and/or Cost of Work is not in agreement between the COUNTY and the CMAR performing the Work.
Construction Change Directives or “CCD” A change order directive is a written order prepared by the Owner, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Price or Contract Schedule, or both.
Construction Change Directives means as the same are defined in the Contract Documents.

Examples of Construction Change Directives in a sentence

  • The approved Schedule of Values shall be updated to reflect current Change Orders and Construction Change Directives and submitted each month to Design Professional along with a completed and notarized copy of the Application for Payment form attached to the Agreement as Exhibit G.

  • This subsystem shall enable Construction Contractor to plan effectively and Owner to monitor and control the funds available for the Project, cash flow, costs, Change Orders, Construction Change Directives, payments, and other major financial factors by comparison of budget, estimate, total commitment, amounts invoiced, and amounts payable, and also enable Owner to stay informed as to the overall Project status.

  • The Contract Documents consist of this Agreement, the Exhibits described in Section 8 hereof, and any duly executed and issued addenda, Change Orders, Construction Change Directives, and amendments signed by Owner relating thereto.

  • Construction Change Directives shall be issued using AIA Form G714.

  • With respect to portions of the Work performed by Change Orders and Construction Change Directives, Developer shall keep and maintain cost-accounting records satisfactory to the District, including, without limitation, Job Cost Reports as provided in these General Conditions, which shall be available to the District on the same terms as any other books and records Developer is required to maintain under the Contract Documents.

  • Any requirements under this Article shall be equally applicable to Change Orders or Construction Change Directives issued to Subcontractors by Developer to the extent required by the Contract Documents.

  • The Consultant shall prepare Change Orders and Construction Change Directives for approval by the Owner and XXXX and for execution in accordance with the Contract Documents.

  • The Contractor shall make available, at the Project site, the Contract Documents, including Change Orders, Construction Change Directives, and other Modifications, in good order and marked currently to indicate field changes and selections made during construction, and the approved Shop Drawings, Product Data, Samples, and similar required submittals.

  • The Contractor shall maintain the following project records at the project site: • Construction Schedule • Plans and Drawings • Specifications • Addenda • Change Orders • Construction Change Directives • Shop Drawings • Product Data • Samples • Required Submittals • Superintendent's Log Records shall be maintained in good order and, marked to reflect current changes and selections made during the construction process.

  • Such Applications for Payment may include requests for payment on account of changes in the Trade Contractor Work that have been properly authorized by Construction Change Directives, but not yet included in a Contract Revision.

Related to Construction Change Directives

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Change Directive means a written order signed by the procurement officer that

  • Change Orders mean changes or modifications to any Construction Contract or any other contract with labor or material suppliers.

  • Change Management means the add-on module to the Programs that enables engineers to define network changes through one or more configuration templates. Those network changes can be applied to multiple devices and executed/rolled back automatically. The Change Management module enables engineers to verify the impact of the changes across the network to help ensure a safer change process.

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Project, together with all supplements, amendments or corrections, submitted by the Developer and approved by the City in accordance with this Agreement.

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Construction Work means any work in connection with⎯

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • construction site means a workplace where construction work is being performed;

  • Unilateral Change Order (ULCO means a Change Order issued by Owner without the complete agreement of Contractor, as to cost and/or time.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Waste Framework Directive or “WFD” means Waste Framework Directive 2008/98/EC of the European Parliament and of the Council on waste

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Building Regulations means the National Building Regulations made in terms of the National Building Regulations and Building Standards Act, 1977 (Act No. 103 of 1977);

  • Change Order means a written instrument signed by Owner and Contractor stating their agreement upon all of the following: (1) a change in the Work; (2) the amount of the adjustment in the Contract Sum, if any, and (3) the extent of the adjustment in the Contract Time, if any.

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;