Constructing a well definition

Constructing a well or "construct a well" means:
Constructing a well or "construct a well" means and includes
Constructing a well or "construct a well" means: boring, digging, drilling, or excavating a well; installing casing, sheeting, lining, or well screens, in a well; or drilling a geotechnical soil boring. "Constructing a well" or "construct a well" includes the alteration of an existing well.

Examples of Constructing a well in a sentence

  • Some of the most important aspects of the research project that we will cover in depth include:• Constructing a well defined question or problem to define our research project.• How to make ethical considerations in research design and reporting.• How to construct surveys to result in unbiased, reliable, and useful information.• How to use statistical methods and data visualization to analyze data.• How to use writing, presentations, and data visualization to communicate research.

  • Constructing a well thought-out sample In designing the DLH survey, we drew on Statistics Canada's experience in the 1986 and 1991 population censuses, when it conducted a preliminary selection ahead of its Health and Activity Limitation Surveys (HALSs).

  • Constructing a well around the opening with proper drainage at the base may be necessary if the access is too low and in contact with grade.

  • Constructing a well or boring in a “Special Well and Boring Construction Area” without plan review.

  • Driving plastic casing.4. Minnesota Rules, part 4725.2850: Constructing a well or boring with a gravel pack that extends greater than 10 feet above static, or greater than 10 feet above top or below bottom of screen.

  • Minnesota Rules, part 4725.2020, and Minnesota Rules, part 4727.0975: Constructing a well or boring with greater than 10 feet of ungrouted borehole or screened interval through a confining layer.

  • Constructing a well – organised scientific writing is the first step to improving accessibility and readability.

  • Constructing a well thought-out sample In designing the DLH survey, we drew on Statistics Canada's experience in the 1986 and 1991 population censuses, when it conducted a preliminary selection ahead of its Health and Activity Limitation Surveys (HALS).

  • Constructing a well near Kalu ganga and supply water for a water scheme A well and a pump house had been constructed by spending Rs.1,685,451 under the Community Water Supply and Sanitary Project.

  • The proposed method consist of three major parts, the autoencoder, the classifier and the XAI module, which are discussed in below in the following three sub-sections.

Related to Constructing a well

  • Constructing Entity means either the Transmission Owner or the New Services Customer, depending on which entity has the construction responsibility pursuant to Tariff, Part VI and the applicable Construction Service Agreement; this term shall also be used to refer to an Interconnection Customer with respect to the construction of the Customer Interconnection Facilities. Construction Party:

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Excavation means the mechanical removal of earth material.

  • Constructed wetlands means areas intentionally designed and created to emulate the water quality improvement function of wetlands for the primary purpose of removing pollutants from stormwater.

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Substation means the apparatus that connects the electrical collection system of the WECS(s) and increases the voltage for connection with the utility's transmission lines.

  • Water well means an excavation that is drilled, cored, bored, augered, washed, driven, dug, jetted, or otherwise constructed for the purpose of exploring for groundwater, monitoring groundwater, utilizing the geothermal properties of the ground, or extracting water from or injecting water into the aquifer. “Water well” does not include an open ditch or drain tiles or an excavation made for obtaining or prospecting for oil, natural gas, minerals, or products mined or quarried.

  • construction site means a workplace where construction work is being performed;

  • Shallow well means a well located and constructed in such a manner that there is not a continuous layer of low permeability soil or rock (or equivalent retarding mechanism acceptable to the department) at least 5 feet thick, the top of which is located at least 25 feet below the normal ground surface and above the aquifer from which water is to be drawn.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Native vegetation means plant species that are indigenous to the region.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction and demolition debris means and includes:

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Dry well means a type of infiltration practice that allows storm water run-off to flow directly into the ground via a bored or otherwise excavated opening in the ground surface.

  • RUNNING CHARGE PER KILOMETER means the rates payable against each KM run. and shall be deemed to include all the expenditures of the Transport Supplier viz., cost of fuel, tyre/tube, battery & consumables like lubricants etc. and other maintenance expenditures including accessories involved including GST element as applicable towards movement of the vehicle(s)/equipment.

  • stratigraphic test well means a drilling effort, geologically directed, to obtain information pertaining to a specific geologic condition. Ordinarily, such wells are drilled without the intention of being completed for hydrocarbon production. They include wells for the purpose of core tests and all types of expendable holes related to hydrocarbon exploration. Stratigraphic test wells are classified as (i) "exploratory type" if not drilled into a proved property; or (ii) "development type", if drilled into a proved property. Development type stratigraphic wells are also referred to as "evaluation wells".

  • Area of concern or “AOC” shall mean any area that has had a probable release of a hazardous waste or hazardous constituents and that is determined by the Department to pose a current or potential threat to human health or the environment.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Basal area means the effective surface area available to transmit the treated effluent from the filter media in a mound system into the in-situ receiving soils. The perimeter is measured at the interface of the imported fill material and in-situ soil. On sloping sites, only the area down-gradient from the up-slope edge of the distribution media may be included in this calculation.

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.