Conceptual Drawings definition

Conceptual Drawings means the Contractor‟s drawings of the Works as listed in the Contract Data, and any Variation to such drawings.
Conceptual Drawings means the limits, layout, and configurations depicted in the plan set "CNG Fueling Site Plan Layouts" dated January 30, 2015, as updated from time to time prior to the Setting Date, contained in Folder 02 – Design of the RID portion of the Disclosed Information contained on the Collaboration Portal.
Conceptual Drawings means the conceptual drawings attached hereto as Exhibit B.

Examples of Conceptual Drawings in a sentence

  • Conceptual Drawings - The maps or drawings accompanying a subdivision plat and showing the specific location and design of improvements to be installed in the subdivision in accordance with the requirements of the Planning Commission.

  • Conceptual Drawings of Protection work of Bank & bridges and preparation of plans thereof.

  • See Exhibit F – Conceptual Drawings for pavement restoration details.

  • Email in PDF format the following ( as applicable): Plat of Survey, Site Plan, Preliminary Plat, Final Plat, Conceptual Drawings, Elevation Plans, Landscape Plans, Pictures, etc.

  • C.7.4.2.5.3 The Contractor shall provide documentation for one of the following (order of preference): 1) Product drawings 2) Developmental Drawings 3) Conceptual Drawings in the form of Catalogue pages (pages must meet data requirements for fully identified item.

  • A/E shall provide information to TFC for a detailed schedule to accommodate a thorough and periodic review of the Construction Documents at the following milestones and in the sequential order listed: (i) Initial Conceptual Drawings; (ii) Schematic Design; (iii) Design Development; (iv) 65% Construction Documents; (v) 95% Construction Documents; and (vi) 100% Construction Documents.

  • Initial Conceptual Drawings means initial concept drawings and block diagrams that, in TFC’s sole opinion, are of such quality and detail to enable TFC to establish design direction.

  • Conceptual Drawings should NOT be in the form of amorphous bubble diagrams.

  • Once you have successfully logged in, you will see the standby screen with the following icons:wrench (Figure B).

  • Conceptual Drawings of minimum 3 different types of bridges from aesthetic view point.


More Definitions of Conceptual Drawings

Conceptual Drawings means that plan views will be drawn for purposes of determining the overall layout. Precise details are not included at this phase and will be part of the Production Drawings.
Conceptual Drawings means the Contractor’s drawings of the Works as listed in the
Conceptual Drawings. Owner will provide site map and topo phic survey of proposed site at no cost to VRB. Based upon information provided by Owner as to required railcar capacity, types of railcars, and service needs, VRB will furnish a Conceptual Plan indicating a possible track layout This plan is for discussion purposes and does not guarantee railroad approval and is subject to final field survey, drainage considerations, utility conflicts, construction drawings, local permits, and railroad approvals. A track construction cost estimate will be provided. for Owner’s budgeting purposes.
Conceptual Drawings means those certain architectural drawings depicting the concept of the Project, prepared by the Architect and set forth in the Proposal.

Related to Conceptual Drawings

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Working Drawings means the final working drawings approved by Landlord, as amended from time to time by any approved changes thereto, and “Work” means all improvements to be constructed in accordance with and as indicated on the Working Drawings, together with any work required by governmental authorities to be made to other areas of the Building as a result of the improvements indicated by the Working Drawings. Landlord’s approval of the Working Drawings shall not be a representation or warranty of Landlord that such drawings are adequate for any use or comply with any Law, but shall merely be the consent of Landlord thereto. Tenant shall, at Landlord’s request, sign the Working Drawings to evidence its review and approval thereof. After the Working Drawings have been approved, Tenant shall cause the Work to be performed in accordance with the Working Drawings.

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Shop Drawings means drawings, submitted to the PHA by the Contractor, subcontractor, or any lower tier subcontractor, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract. The PHA may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • The DRAWINGS / MAPS means the drawing/map or drawings/maps mentioned in NIT and any modifications of them approved by the Employer or any further Working drawings/maps or sketches by the Employer or any further working drawings/maps or sketches which may be furnished or approved in writing by the Employer.

  • Drawings means the drawings prepared by the Architects and issued by the Engineer and referred to in the specifications and any modifications of such drawings as may be issued by the Engineer from time to time ‘Contract value shall mean value of the entire work as stipulated in the letter of acceptance of tender subject such additions there to or deductions there from as may be made under the provide herein after contained.

  • Record Drawings means a reproducible set of Construction Documents into which the Architect has incorporated: (a) clarifications, sketches and other Modifications made by the Architect during the Construction Phase; and (b) significant changes in the Work made during construction as shown on the Trade Contractor’s As-Built Drawings.

  • Shop Drawing means any and all drawings, diagrams, layouts, explanations, illustrations, manufacturer's drawings or other written or graphic materials which illustrate any portion of the construction work.

  • Final Drawing has the meaning specified in Section 3.05(i).

  • Space Plan herein means, to the extent required by the nature of the Work, detailed plans (including any so-called “pricing plans”), including a fully dimensioned floor plan and drawn to scale, showing: (i) demising walls, interior walls and other partitions, including type of wall or partition and height, and any demolition or relocation of walls, and details of space occupancy and density, (ii) doors and other openings in such walls or partitions, including type of door and hardware, (iii) electrical and computer outlets, circuits and anticipated usage therefor, (iv) any special purpose rooms, any sinks or other plumbing facilities, heavy items, and any other special electrical, HVAC or other facilities or requirements, including all special loading and related calculations, (v) any space planning considerations to comply with fire or other codes or other governmental or legal requirements, (vi) finish selections, and (vii) any other details or features requested by Architect, Engineer or Landlord, or otherwise required, in order for the Space Plan to serve as a basis for Landlord to approve the Work, and for Tenant to contract and obtain permits for the Work, or for the Space Plan to serve as a basis for preparing Construction Drawings.

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Non-Extension Drawing has the meaning specified in Section 3.5(d).

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Building Plans mean the general building plans and specifications in respect of the Development or in respect of any part or parts of the Development prepared by the Authorized Person and approved by the Building Authority and include any approved amendments thereto;

  • Construction Work means any work in connection with⎯

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Design Documents means, collectively and as applicable, the Conceptual Design Documents, Schematic Design Documents, the Design Development Documents and the Construction Documents prepared by the Trade Contractor.

  • Project Improvements means site improvements and facilities that are:

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Tenant Improvements Defined in Exhibit B, if any.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Development Project means a project for the development of land within a