Completion of Loading definition

Completion of Loading means the time and date at which the operation of loading is completed, as recorded on the tanker time sheet prepared by the Terminal Operator;
Completion of Loading means the time (after the loading of the LNG Ship or, in the case of Clauses 7.16, 7.18, 7.21 and 7.27 only, after the loading of the LNG Ship or a failure to load the LNG Ship) at which LNG loading and vapor return lines have been finally disconnected at the Loading Port (or, if the LNG Ship has not been connected to the LNG loading and vapor return lines at the Loading Port, at the time at which the failure to deliver or take (as applicable) the relevant LNG Cargo arises);
Completion of Loading means, for loading operations with respect to a particular Vessel, the time at which such Vessel has ceased receiving Product and the Dock’s loading arm has been disconnected or could have been disconnected but for the Vessel.

Examples of Completion of Loading in a sentence

  • Completion of Loading + 48 hours The Buyer shall ensure that the original bill(s) of lading are released to the relevant party at loading port within 48 hours of the completion of loading of the vessel.

  • Before Completion of Loading The Buyer shall provide final documentary instructions to the Seller.

  • Buyer shall, within forty-eight (48) hours following Completion of Loading, notify Seller of the volume of LNG loaded.

  • Customer must notify Enterprise of any Claim for demurrage under this Section 8 in writing, and must provide a fully documented claim therefor within ninety (90) calendar days following Completion of Loading for the applicable Vessel.

  • Twelve (12) Hours Prior to Completion of Loading 2.15.1. The Customer must check and confirm that the approved late arrival containers which are stacked in the Terminal are to be loaded onto a specific vessel.2.15.2. The confirmation in Clause 2.15.1 must be accompanied by the revised stowage instructions for these late arrival containers.

  • Total Period for Completion of Loading & transportation of scrap is 2 to 4 months commencing from the date from issuance of formal order.

  • Completion of Loading The Export Tanker will advise the Mooring Master when to stop cargo loading unless the nominated quantity has been delivered by the Terminal, in which case the Terminal will stop the cargo transfer.

  • In the event Customer’s Vessel fails to vacate its berth at the Terminal upon Completion of Loading or as otherwise required under the Marine Provisions and/or under the Port Procedures (as applicable), unless such failure is caused solely by Enterprise, Customer will pay Enterprise an additional dockage fee equal to $7,000 per hour for each hour (or part thereof) that such Vessel so remains at its berth at the Terminal (the “Excess Occupancy Payment”).

  • An annual review and a five-year update of the District Master Plan are crucial to provide an efficient planning methodology to maintain infrastructure reliability and ensure sufficient system capacity.

  • For the purpose of Article 5.6.3.2, the Completion of Loading date shall count as Day one.


More Definitions of Completion of Loading

Completion of Loading means, with respect to a given Cargo, the time at which the cargo manifold on the Vessel is disconnected from the flange coupling of the loading line at the Production Terminal after the Cargo has been fully (subject to retention of heel as specified in this Agreement) loaded onto the Vessel.
Completion of Loading means, in respect of an FOB delivery, the disconnection of the flange coupling of the cargo manifold of an LNG Vessel from the flange coupling on the loading line at Seller’s Facilities following loading of the LNG Vessel and completion of final gauging.
Completion of Loading means, following loading of a Cargo on the relevant Approved LNG Ship, the time at which:

Related to Completion of Loading

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Bulk mixing plant means machinery, appliances or other similar devices that are assembled in such a manner so as to be able to mix materials in bulk for the purposes of using the mixed product for construction work;

  • construction site means a workplace where construction work is being performed;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Bulk plant means a motor fuel storage and distribution facility that is not a terminal and from

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Installation Site means the site at which the Product is originally installed.

  • Completion of Services means..................................................

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Attachment Facilities means the facilities necessary to physically connect a Customer Facility to the Transmission System or interconnected distribution facilities.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Construction Work means any work in connection with⎯

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.