Installation inspector means a person who, by reason of his knowledge of the physical sciences and the principles of engineering, acquired by a professional education and related practical experience, is qualified to supervise the installation of tank systems.
Home inspection means the on-site, physical review of the home of an applicant to assure the applicant and the home meets all health and safety requirements within these rules.
Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;
Construction Completion means physical construction of a cleanup action component is complete.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
Improvement completion assurance means a surety bond, letter of credit,
Initial inspection means the first on-site inspection of facilities to verify declarations submitted pursuant to Articles III, IV, V and VI and this Annex.
Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.
Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.
Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:
Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity
Construction Work means any work in connection with⎯
Project Completion Date means the date on which the Completion Certificate is issued;
Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;
Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;
Due Diligence Examination shall have the meaning set forth in Section 3.2.
construction site means a workplace where construction work is being performed;
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Home inspection report means a written report that is
The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Study Site means the location(s) under the control of the Institution where the Study is actually conducted as set out in Schedule 1.
Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.