Examples of CAISO Grid in a sentence
The Delivery Point is at the point of interconnection with the CAISO Grid, [insert name or location].
The Delivery Point will be (i) for each Distributed Resource composing the Project that is located behind a Customer’s retail meter, the load meter(s) for such Distributed Resource, and (ii) for each Distributed Resource composing the Project that is not located behind a Customer’s retail meter, the point of interconnection for such Distributed Resource to the CAISO Grid, and in each case (i) and (ii), as depicted in Appendix III.
If there are determined to be deliverability Network Upgrade costs on the CAISO Grid as an affected system of the Native Balancing Authority as a result of this Project, Buyer can request that Seller elect to fund or elect not to fund all deliverability Network Upgrades.
Seller shall fulfill all contractual, metering and applicable interconnection requirements, including those set forth in Participating Transmission Owner’s applicable tariffs, the CAISO Tariff and implementing CAISO standards and requirements, including, but not limited to, executing applicable interconnection agreements, Participating Generator Agreement, Meter Service Agreement and PTO Generator Special Facilities Agreements, if applicable, so as to be able to deliver Energy to the CAISO Grid.
SCE or the CAISO may require Seller, at Seller’s expense, to demonstrate to SCE’s reasonable satisfaction the correct calibration and operation of Seller’s Protective Apparatus any time SCE or the CAISO has reason to believe that said Protective Apparatus may impair the integrity of the PTO’s electric system or CAISO Grid.
The Energy Delivery Point shall be [the point of interconnection of the Project to the CAISO Grid at ________] (as described and set forth in the single-line diagram of grid interconnection attached hereto as Appendix 1.3.1).
Transmission System – Those facilities owned by the Distribution Provider that have been placed under the CAISO’s operational control and are part of the CAISO Grid.
Seller shall fulfill all contractual, metering and applicable interconnection requirements, including those set forth in Participating Transmission Owner’s applicable tariffs, the CAISO Tariff and implementing CAISO standards and requirements, including, but not limited to, executing applicable interconnection agreements, Participating Generator Agreement and Meter Service Agreement so as to be able to deliver Energy to the CAISO Grid.
If the Limited Operations Study provides that the Project can be interconnected to the CAISO Grid on the basis set forth in the LGIA (“Limited Operation Plan”) by [insert target date, which must be the same as the planned date of interconnection to the CAISO Grid] then Buyer shall have the right, but not the obligation, to pay Seller the Contract Price for the Lost Output (the “Curtailment Option”).
If Buyer elects to exercise the Curtailment Option, then Seller must agree to pursue the Limited Operation Plan and interconnect the Project to the CAISO Grid under that plan.