CAISO Balancing Authority Area definition

CAISO Balancing Authority Area has the meaning set forth in the CAISO Tariff. “CAISO Grid” has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
CAISO Balancing Authority Area has the meaning set forth in the CAISO Tariff. “CAISO Certification” means the certification and testing requirements for a storage unit set forth in the CAISO Tariff that are applicable to the Facility, including certification and testing for all Ancillary Services, PMAX, and PMIN associated with such storage units, that are applicable to the Facility.
CAISO Balancing Authority Area has the meaning set forth in the CAISO Tariff.

Examples of CAISO Balancing Authority Area in a sentence

  • Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the CAISO Balancing Authority Area, including, but not limited to; 1) the rules and procedures concerning the operation of generation set forth in the CAISO Tariff for the CAISO Controlled Grid and; 2) the Operating Requirements set forth in Attachment 5 of this Agreement.

  • Similarly, the CAISO models the resistive component for transmission losses on an IBAA but does not allow such losses to determine LMPs that apply for pricing transactions to and from an IBAA and the CAISO Balancing Authority Area, unless allowed under a Market Efficiency Enhancement Agreement.

  • The CAISO and each MSS Operator shall cooperate with each other in performing system surveys and inspections to the extent these relate to the operation of the CAISO Balancing Authority Area.

  • The CAISO, the MSS Operator and Participating TOs shall share information such as projected Load growth and system expansions necessary to conduct necessary system planning studies to the extent that these may impact the operation of the CAISO Balancing Authority Area.

  • All information pertaining to the physical state or operation, maintenance and failure of the MSS affecting the operation of the CAISO Balancing Authority Area that is made available to the CAISO by the MSS Operator shall also be made available to Scheduling Coordinators, provided that the CAISO shall provide reasonable notice to the MSS Operator.

  • For Bids and Schedules between the CAISO Balancing Authority Area and the IBAA, the CAISO will model the associated sources and sinks that are external to the CAISO Balancing Authority Area using individual or aggregated injections and withdrawals at locations in the FNM that allow the impact of such injections and withdrawals on the CAISO Balancing Authority Area to be reflected in the CAISO Markets Processes as accurately as possible given the information available to the CAISO.

  • The CAISO, Participating TOs and SUDCs shall share available information such as projected SUDC Load growth and SUDC system expansions necessary for the CAISO or the Participating TOs to conduct necessary system planning studies to the extent that such SUDC Load growth or SUDC system expansions will materially impact the operation of the CAISO Balancing Authority Area and the CAISO Controlled Grid.

  • The RUC Bid Cost Uplift shall be the net of the RUC Bid Cost Shortfalls and RUC Bid Cost Surpluses for a Settlement Interval of all Bid Cost Recovery Eligible Resources in the CAISO Balancing Authority Area with Unrecovered Bid Cost Uplift Payments.

  • Alternative Resource IDs to be used instead of the default Resource IDs will be created and adopted for use in conjunction with Intertie Scheduling Point Bids and Schedules between the CAISO Balancing Authority Area and the IBAA based on a Market Efficiency Enhancement Agreement.

  • Prior to the establishment of a new IBAA or a change to an existing IBAA, the CAISO will define and publish default Resource IDs to be used for submitting import and export Bids and for settling import and export Schedules between the CAISO Balancing Authority Area and the potential or existing IBAA.


More Definitions of CAISO Balancing Authority Area

CAISO Balancing Authority Area means the system of transmission lines and associated facilities that is operated by the CAISO and for which the CAISO has operational control and responsibility for system reliability.

Related to CAISO Balancing Authority Area

  • InterMTA Traffic means traffic to or from WSP’s network that, at the beginning of the call, originates in one MTA and terminates in another MTA.

  • Certified Remanufacture System or Verified Engine Upgrade means engine upgrades certified or verified by EPA or CARB to achieve a reduction in emissions.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see definition of “flood”).

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.