Examples of BIM Execution Plan in a sentence
Engineer shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows.
The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this agreement.
Engineer shall provide updated documents derived from the model(s) at each Contractor’s monthly meeting and when requested and as indicated in the BIM Execution Plan.
This section begins with a statement confirming that the Project’s BIM Execution Plan is not a Contract Document.
The Construction Manager shall develop a matrix showing which party is responsible for performing which BIM functions, as previously coordinated between Contractor and AE in the AE’s BIM Execution Plan.
File Preparation Format: Provided in the Project BIM Execution Plan operating in Microsoft Windows operating system.
Professional shall update the BIM model(s) at the end of construction to reflect the actual, "as-built" conditions per requirements as specified in the BIM Execution Plan.
Members of the Project Team are required to coordinate all efforts with respect to the BIM in accordance with the guidelines set forth in the BIM Execution Plan developed for the Project.
File Submittal Format: Submit or post coordination drawing files as required in the Project BIM Execution Plan.
The BIM Execution Plan shall be updated and augmented by the Professional, with concurrence and agreement by the Owner and Construction Manager, throughout design and construction as needed to solidify details regarding terminology, schedule, content, format, risk allocation, and use of the model(s).