Appendix 2 definition

Appendix 2. CLASSIFICATION STRUCTURE GENERAL DUTIES OF EMPLOYEES‌‌
Appendix 2 means Appendix 2 to CITES and “Appendix 2 specimen” means a specimen of a species listed in Appendix 2;
Appendix 2. Saved Clauses” will apply only to the particular agency to which the part refers, unless the clause otherwise provides; and clauses in any schedule in “Appendix 4: Workplace Flexibility Agreements” will apply only to the workplace specified in the schedule.

Examples of Appendix 2 in a sentence

  • Part B: Quality- and Cost-based Selection Except as otherwise provided in Part C of this Section, consultants’ services shall be procured under contracts awarded in accordance with the provisions of Section II of the Consultant Guidelines, paragraph 3 of Appendix 1 thereto, Appendix 2 thereto, and the provisions of paragraphs 3.13 through 3.18 thereof applicable to quality- and cost-based selection of consultants.

  • The provisions of paragraphs 2.54 and 2.55 of the Guidelines and Appendix 2 thereto shall apply to goods manufactured in the territory of the Borrower.

  • Details of consultation responses received are set out in Appendix 2.

  • If the grievance is not resolved at Step Three within ten (10) working days of the meeting referred to in Article A.6.4, the local or the employer where applicable may refer a "local matters grievance," as defined in Appendix 2 and Addenda, to arbitration within a further fifteen (15) working days.

  • In the event of any conflict between a provision of Schedule F that FERC has accepted and any provision of Appendix 2 to this ISA that relates to the same subject matter, the pertinent provision of Schedule F shall control.


More Definitions of Appendix 2

Appendix 2 means the provisions of the Plan contained in Appendix 2, which covers Employees employed at the Kalamazoo Board Mill or the Kalamazoo Carton Plant and represented by the union identified in Appendix 2.
Appendix 2 contains the specifications and requirements for the System and Services;
Appendix 2. Accounting Policies 2018/19 Accounting Policy New policy Amended policy No change In line with Code
Appendix 2. PROGRESS REPORT ON WENDELSTEIN 7-X CONSTRUCTION‌ The Wendelstein 7-X project coordinates human resources, technical activities, the technical part of industry contracts and the contributions from other research centres and takes care of the interfaces between physics and engineering. The collaboration with other institutions is of utmost importance for the Wendelstein 7-X project. KIT, FZJ and CEA provide immediate support via the supply of technical components and tests for Wendelstein 7-X subsystems. EURATOM continues to support the project with senior experts consulting on key project tasks. The collaboration with ERM/KMS and FZJ for the ICRH has been further intensified. FZJ/TEC, the Wigner Institute Budapest, and the Polish Association are strongly involved in the development of diagnostics. The cooperation with KIT on the ECRH system is running well. The collaboration with KIT regarding the design and construction of the current leads for the superconducting coils has been successfully concluded with the final delivery of the last current leads. The collaboration with Polish research institutes is running smoothly. IPJ Swierk is continuing its work on the neutral beam injection system for W7-X. Various diagnostic systems are being developed by Polish institutes and universities. Within the collaboration with US laboratories, PPPL provides the trim coils for W7-X and the respective power supplies. All five coils and the power supplies have already been delivered to Greifswald. ORNL develops the design for the divertor scraper element, an additional high-heat-flux component to protect the divertor during plasma start-up with high power discharges. LANL is developing a fast infrared camera system for divertor monitoring.  Wendelstein 7-X construction (preferential support activity) The restructuring of operational phase 1 in two separate phases OP 1.1 and OP 1.2 and the revised plan of the KiP-assembly over three installations phases are now the working basis for the project schedule. Milestone 27 “Completion of Cryostat”, which marks the start of commissioning, is now the top priority of the project. Magnet system The current leads for the superconducting coil system have been completely assembled on three modules, the preparation for the remaining four CL-pairs is progressing according to the plan. All CLs are already installed in their final position. The power supplies for the five trim coils provided by PPPL have been delivered to the IPP; four co...
Appendix 2. The Research Programme (Insert Research Programme)
Appendix 2 retention periods by category of purpose] International data transfers Your data are likely to be transferred to, hosted in or viewed from a country located outside the European Union where the legislation with regard to data protection is not equivalent to that of France or the European Union. We will only make such transfers of data to fulfil the terms of a contract between yourself and HSBC, fulfil a legal obligation, protect the public interest, and defend our legitimate interests. When data about you is transferred to a country outside the European Union, we will always make sure that it is protected. To this end, we submit all transfers of your data to appropriate and relevant safeguards (such as encryption and contractual commitments, including the conclusion of standard contractual clauses approved by the EU). You can obtain further information on how we transfer your personal data outside the European Union by contacting us directly: see the section "More details about your data".
Appendix 2. ABPI Clinical Trial Compensation Guidelines 2015 and Appendix 3: Form of Indemnity Both appendices are the current ABPI documents and no proposed modifications to either will be accepted.