Workcycles Sample Clauses

Workcycles may be changed to meet operating needs, provided the employee is notified of such change prior to the end of the previous work cycle.
AutoNDA by SimpleDocs

Related to Workcycles

  • Bicycles Bicycles or other vehicles shall not be permitted anywhere inside or on the sidewalks outside of the Building, except in those areas designated by Landlord for bicycle parking.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • DEBRIS Contractor shall be responsible for the prompt removal of all debris which is a result of this contractual service.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Debriefing If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

  • Trees 1) Any major tree surgery or tree removal over a three (3) inch diameter, which becomes necessary through no fault of the Contractor, will be at the County's expense.

  • Workdays 1. All workdays when the central and administrative offices are open shall be duty days for unit members employed on a 12-month basis.

  • Rotation Where the Employer's designate and the Union's designate at the local level agree that shifts be rotated, the shifts shall be rotated on an equitable basis among the employees involved.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

Time is Money Join Law Insider Premium to draft better contracts faster.