Common use of Work Method Clause in Contracts

Work Method. The Contractor shall use Labour or Equipmentto carry out this Item work. Quality Control  The gravel surface width shall be checked at every 100m interval using tape measure and shall have tolerance of + / - 50mm.  Trial holes at every 100m shall be used to check the gravel surface thickness and shall have a tolerance of + 5mm / - 0mm.  The camber cross fall shall be checked at every 50m and the maximum tolerances shall be + / - 1 %  The longitudinal profile shall be checked with every load to ensure a smooth surface with no corrugations or depressions Measurement: m3 The unit of measurement shall be in cubic metres of compacted material on carriageway Payment The unit rate shall be the full compensation for labour, tools, equipment and any incidental costs required for carrying out the work.

Appears in 3 contracts

Samples: www.kenha.co.ke, www.kenha.co.ke, www.kenha.co.ke

AutoNDA by SimpleDocs

Work Method. The Contractor shall use Labour or Equipmentto carry out this Item work. Quality Control  The gravel surface width shall be checked at every 100m interval using tape measure and shall have tolerance of + / - 50mm.  Trial holes at every 100m shall be used to check the gravel surface thickness and shall have a tolerance of + 5mm / - 0mm.  The camber cross fall shall be checked at every 50m and the maximum tolerances shall be + / - 1 %  The longitudinal profile shall be checked with every load to ensure a smooth surface with no corrugations or depressions Measurement: m3 The unit of measurement shall be in cubic metres of compacted material on carriageway Payment The he unit rate shall be the full compensation for labour, tools, equipment and any incidental costs required for carrying out the work.

Appears in 1 contract

Samples: www.kenha.co.ke

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.