Wind Turbines Sample Clauses

POPULAR SAMPLE Copied 1 times
Wind Turbines. Inside: All electrical work within the confines of the wind turbine itself up to the secondary side of the transformer at the base of the wind turbine, including the setting of the generator. In designs where the transformer is mounted within the confines of the wind turbine (i.e., mounted internally at the top of the structure), the Inside branch will have jurisdiction to the first connect location outside the confines of the wind turbine (splice point, top location, etc.).
Wind Turbines. This report assumes the Project utilized the most expensive turbine scenario to decommission, the nine (9) Siemens SWT2.3 turbines, each rated at 2.3 megawatts (“MW”) and 58 Siemens Gamesa G132 turbines, each rated at 3.75
Wind Turbines. This section identifies specific advanced materials dependencies of the energy sector through analysis of the value chain specifically of wind-power technologies (Table 5). These are dependent on permanent magnets, typically using rare-earth elements: neodymium, and dysprosium.19 There are further CRM-containing technologies in the wind turbines such as control electronics and batteries which are excluded from this analysis. 16 New York Times (2010). The dozens of computers that make modern cars go (and stop), available at xxxx://xxx.xxxxxxx.xxx/2010/02/05/technology/05electronics.html?_r=0 17 Xxxxxx, Xxxx et al., (2013). CRM_InnoNet - Internal report summarising the results of ICT and electronics sector analysis. xxxx://xxx.xxxxxxxxx.xxx/xxx.xxxxxxxxxxxxxxxxxxxx.xx/uploads/D4-1-ICTsector-reportfinal.pdf 18 Xxxxxx A, Xxxxxxxxxx X, (2013) Rapport technique DTBH/DR/2013/133 CRM-Innonet Project - Internal report summarising the results of energy sector analysis 19 Institute for Energy Research, 2013. Big wind’s dirty little secret: Toxic lakes and radioactive waste, available at xxxx://xxxxxxxxxxxxxxxxxxxxxxxxxx.xxx/analysis/big-winds-dirty-little-secret-rare-earth-minerals/ A key contributor to renewable energy is observed to be wind energy and it is estimated that approximately 15% of the 2030 average EU electricity mix will potentially come from wind for short, medium and long term energy provision. 20 Wind turbines convert wind energy captured by blades into the rotation of a shaft. This rotation is then transformed into electricity through a generator. Two main markets exist, with different requirements on equipment: on-shore and off-shore wind turbines. The latter obviously operates in a more demanding environment (weather conditions, saline and corrosive environments) and is potentially more difficult to access. A general trend towards larger and more powerful wind turbines is observed, particularly for the off-shore market. Wind turbines are typically made of a tower supporting a nacelle and a rotor, connected through a rotating shaft. Typical components of the nacelle are the gearbox (when necessary) to which the shaft is connected, the electric generator, and other systems components - shaft brake, controller, weather sensors, yaw control system, cooling system - all containing CRMs as shown in Figure 1. The tower also contains some electrical components, in particular related to yaw control, and the connection to the electrical cable.21
Wind Turbines. Wind turbines are discussed in detail in Work Packages 1 and 3. Here follows the equations necessary to model a basic wind turbine. This can be modified for vertical or horizontal axis turbines via the coefficient of performance. The model has been built in Matlab/Simulink and connected to GES through a GES module. The series of equations that describe a basic wind turbine model will be explained in this section.
Wind Turbines. With respect to any Wind Farm to be developed and constructed by the Company or the Subs, unless the Management Committee unanimously decides otherwise, XxXxxx shall cause XxXxxx, Inc.: (a) to enter into any turbine supply agreements, warranty agreement, and operations and maintenance arrangement at market rates, except as set forth in Section 2.11(b); and (b) to provide all turbines to be purchased by the Company and the Subs at the following prices: (i) for the first ten (10) MWs of turbines, a total price of thirteen million eight hundred seventy-five thousand dollars ($13,875,000); (ii) for the next ten (10) MWs of turbines, a total price of fourteen million three hundred seventy-five thousand dollars ($14,375,000); and (iii) for all additional turbines, actual cost plus ten percent (10%). ; provided, however, if the Company or the Subs have not provided notice to proceed under any Turbine Supply Agreements within 36 months after the Effective Date, XxXxxx shall be released from any obligation to cause XxXxxx, Inc. to deliver such turbines to the Subs by delivering written notice to the Management Committee that XxXxxx elects to be released from such delivery obligation.
Wind Turbines. A wind turbine features a nacelle mounted on a tower. The nacelle houses the generator and gearbox, and supports the rotor and blades at the hub. The turbine tower supports and provides access to the nacelle. The turbines are connected by power collection systems linked to an electric substation.
Wind Turbines 

Related to Wind Turbines

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Deland Actel has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Deland Actel. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Deland Actel (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Deland Actel, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Deland Actel will then have the option of paying the one-time SC rates to place the Loop.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Fabrication Making up data or results and recording or reporting them.