Water Supply System Sample Clauses

Water Supply System. Water Supply and its Charges
AutoNDA by SimpleDocs
Water Supply System. Contractor shall perform routine preventive maintenance for all system equipment in accordance with the City and the Orange County Fire Authority (OCFA) requirements, manufacturer’s recommendations, applicable maintenance and construction standards and practices on a weekly basis. Contractor shall perform routine maintenance in a timely fashion and with no system disruption/shutdown. County will provide Contractor with plans for all components of the WSS. Contractor shall review manuals thoroughly. On a weekly basis, Contractor shall conduct all necessary readings, visual inspections and preventive maintenance for all components of the WSS, including the automated control panel and the following components as listed below. - Pump Station - Pumps - 100,000 gallon reservoir tank (2) - 53,000 gallon water tank (1) - 7,000 gallon irrigation water tank (1) - 20,000 gallon stand-tower (2) - Booster pumps and motors - Altitude valve (1) - manufactured by Cla-Val - Air release valves - manufactured by Apco - Backflow prevention (6) and other backflow prevention devices - Fire suppression and sprinkler systems - Fire hydrant (1) - Remote monitoring and control interface Task B. Olinda Scheduled Preventive Maintenance Based on O&M manuals and manufacturers’ recommendations, Contractor shall prepare a list/schedule of preventive maintenance for the various components of the GWCMS and WSS. Contractor shall submit such list/schedule to Contract Administrator within thirty (30) calendar days of contract award date for review and approval. The scheduled preventive maintenance shall be performed in a timely manner and with minimum disruption to the operation of any components of the system. Prior to proceeding with the scheduled maintenance, Contractor shall submit a written proposal and obtain a preauthorization or a “Notice to Proceed” from Contract Administrator as described in Section IV Contractor Requirements.
Water Supply System. The Concessionaire shall provide a water supply system adequate to meet the requirements for Land filling, drinking and washing purposes in accordance with Good Industry Practice.
Water Supply System a) Quarterly Maintenance Service Lubrication of motors for water pumps shall be completed per manufacturer’s recommendation. A maintenance log shall be kept, which includes contractor maintenance personnel name, date, and maintenance procedures used. Copies shall be provided to Contract Administrator.
Water Supply System. The river diversion facilities, pumping station, control valves, conduits, structures, pipeline, associated land and land rights and other related common facilities used to convey water from the Green River to the Xxx Xxxxxxx Project and to supply the water for said Project.
Water Supply System. 1.1 The service provider agrees to draw water only from the Water Supply System provided by CSEZ subject to Clause 14.
Water Supply System. The CGF will use an air cooled condenser for cooling of the power generation cycle and to promote water conservation through the reduction of water needs by at least 90% as compared to an evaporative water cooled system. Chehalis municipal supply water will be used for process make-up and potable water needs. The municipal supply water will be obtained from the City of Chehalis pursuant to the City’s existing water rights and will be supplied through the City's municipal water supply system. The Certificate Holder shall notify the Washington Department of Fish and Wildlife (WDFW) and the Critical Issues Council (CIC) of the anticipated location and routing for any municipal water line(s) intended to actually serve the CGF, after the City of Chehalis has established such location and routing and provided the Certificate Holder with notice of its determination. Upon the completion of the preliminary design (including sizing) for each of such municipal water line(s), the Certificate Holder will provide WDFW and the CIC with copies of such preliminary design information.
AutoNDA by SimpleDocs
Water Supply System. 4.6.6.1 Where a public water main is within reasonable access of the subdivision, as determined by the Planning Commission, the subdivider/developer shall be responsible for the cost of extension, design, and installation of any and all water lines which will service the development, including fire hydrants. The system proposed for installation shall adhere to the construction and material specifications of the Town and shall be subject to approval by the Planning Commission and the Tennessee Department of Environment and Conservation.
Water Supply System. The visible water supply system plumbing was inspected according to today's Texas Standards of Practice and or local code and was performing as intended at the time of the inspection.
Water Supply System. 33. The Parties acknowledge and agree that the Owner’s obligations with respect to the Water Supply System are set out in the Phase 1 Agreement. Such obligations shall continue to apply, mutatis mutandis, to the development of the Plan.
Time is Money Join Law Insider Premium to draft better contracts faster.