Water Quality Studies Sample Clauses

Water Quality Studies. (This scope is for the corresponding section(s) as listed in the Affected Environment and Environmental Consequences section of the EA.) The Engineer shall:
AutoNDA by SimpleDocs
Water Quality Studies. The Engineer shall:
Water Quality Studies. (This scope is for the corresponding section(s) of the Water Resources Technical Report.) The Engineer shall:
Water Quality Studies. The Engineer shall: DocuSign Envelope ID: B8DCCCD3-A0B3-4BAD-BC2D-75E46611CBD6
Water Quality Studies. (This scope is for the corresponding section(s) as listed in the Affected Environment and Environmental Consequences section of the EA.) The Engineer shall: • Address all water quality studies in accordance with Section 303(d) of the Clean Water Act as administered by the Texas Commission on Environmental Quality (TCEQ). • Identify if the project is located within five miles of an impaired assessment unit and within the watershed of the impaired assessment unit. • Identify whether the project drains to any impaired assessment unit. • Provide the location of the project within the watershed of the impaired assessment unit. • Identify the impaired assessment unit number, segment name, and segment number. • Identify the pollutant(s) in the discharge for which the water body is listed, and the year of the 303(d) list used in the assessment • If the impaired assessment unit has a Total Maximum Daily Load that has been approved by the Environmental Protection Agency, provide: o the name and date of the Total Maximum Daily Load, o the name and date of any corresponding Implementation Plan, and o a discussion of whether the project is consistent with the approved Total Maximum Daily Load and Implementation Plan. DocuSign Envelope ID: 5A2DC6EC-64DB-4A02-A984-B96FAAFF8279 PeopleSoft Contract No. 7490 Legacy Contract No. 12-7IDP5009 • If unit does not have a Total Maximum Daily Load that has been the impaired assessment approved by the Environmental Protection Agency, indicate: o that the impaired assessment unit does not have a Total Maximum Daily Load that has been approved by the Environmental Protection Agency, and o if the project could discharge the pollutant identified in (d) above. If yes, discuss measures that will be taken to prevent or reduce the likelihood of such a discharge. • Discuss the Best Management Practices that will be used-particularly at the discharge point to the water body to meet other water quality regulations, such as vegetative xxxxxx, silt fencing, compliance with the Texas Pollutant Discharge Elimination System (TPDES).

Related to Water Quality Studies

  • Water Quality 8.1. The Supply shall comply with the quality standards imposed by the Act and the Water Quality Regulations, PROVIDED ALWAYS that where a particular standard is the subject of a legal instrument accepted or issued by the Secretary of State or the Chief Inspector of Drinking Water under the provisions of the Act or the Water Quality Regulations, compliance with the terms of the relevant legal instrument shall be deemed to be compliance with the relevant quality standard imposed by the Act or the Water Quality Regulations (as the case may be), in which case the Water Company shall provide the New Appointee with a certified copy of any such authorised departure or undertaking. Each party undertakes to keep the other party fully informed of any discussions which take place at any time hereafter with the Secretary of State for the proposed issue of a legal instrument and of the outcome thereof.

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Emergency Transportation Ambulance services for emergencies.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Accident Prevention Health and Safety Committee The Employer and the Union agree that they mutually to maintain standards of safety and health in the Hospital in order to prevent accidents, injury, and illness. ected or Recognizing its responsibilities under the applicable legislation, the Hospital agrees to accept as a member of its Accident Prevention Health and Safety Committee, at least one (1) representative sel appointed by the Union from amongst Bargaining Unit employees. Such Committee shall identify potential dangers and means of improving health and safety programs, and recommend actions to be taken to improve conditions related to safety and health. The Hospital agrees to co-operate reasonably in providing necessary information to enable the Committee its functions. Meetings shall be held every second month or more frequently at the call of the Chair if required. The Committee shall maintain minutes of meetings and make the Same available for review. Any representative appointed or accordancewith hereof shall serve for a term of one (1) calendar year from the date of appointment which may be renewed for further of one (1) year. Time off for such to attend meetings of the Accident Prevention Health and Safety Committee in accordance with the foregoing shall be granted, and any attending such meetings during their regularly scheduled hours of work shall not lose regular as a result of such The Union agrees to endeavour to obtain the membership in the observation of all safety rules and practices. Safety Shoes The Hospital will provide sixty dollars ($60.00) annually effective April and eighty dollars ($80.00) effective April to each employee who is required by the Hospital, as delineated below, to wear safety footwear during the of his duties. The Hospital will require employees the following functions to wear appropriate Engineering Services; Grounds; Transport; (only where frequently working in storage areas). (as determined by the Hospital) heavy carts on a regular basis, e.g., linen carts, food wagons. ARTICLE BULLETIN BOARDS The Employer shall provide bulletin that all employees will have access to them have the right to post notices of meetings and such other notices as may be of interest to the membership. The wage increase listed on a retroactive to contact,in writing (with a copy to the Union) at their last-known entitle who have left its employ, to advise them of their any retroactive wage adjustment. Any employees who have employees shall have notice from the Hospital in which to claim from the Hospital any adjustment to their remuneration entitlement. The retroactive payments shall be made by separate cheques to the employees so entitled within sixty (60) days from the date of ratification. All other adjustments shall be effective as set out specifically in this Collective Agreement.

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.