WATER HANDLING EQUIPMENT CLASSIFICATION AND PERSONNEL REQUIREMENTS Sample Clauses

WATER HANDLING EQUIPMENT CLASSIFICATION AND PERSONNEL REQUIREMENTS. A. Engine Equipment Standards and Typing Engine Classification‌ Structural Wildland Requirements 1* 2* 3 4 5 6 7 Tank Minimum Capacity (gal) 300 300 500 750 400 150 50 Pump Minimum Flow (GPM) 1,000 500 150 50 50 50 10 At rated pressure (PSI) 000 000 000 100 100 100 100 Hose, 2 ½’’ (feet) 1,200 1,000 -- -- -- -- -- 1 ½’’ (feet) 500 500 1,000 300 300 300 -- 1’’ (feet) -- -- 000 000 000 300 200 Ladders per NFPA 1901 Yes Yes -- -- -- -- -- Master Stream 500 gal/min. Yes -- -- -- -- -- -- Pump and Roll -- -- Yes Yes Yes Yes Yes Maximum GVWR (lb) -- -- -- -- 26,000 19,500 14,000 Personnel (minimum) 4 3 3 2** 2** 2** 2** * Type 1 and 2 Structural Engines must also meet minimum equipment and PPE specifications of NFPA 1901, Standard for Automotive Fire Apparatus. ** Type 4 through 7 Engines may be ordered with an additional crewmember at the request of the host agency.
AutoNDA by SimpleDocs

Related to WATER HANDLING EQUIPMENT CLASSIFICATION AND PERSONNEL REQUIREMENTS

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8

  • Personnel Requirements a. The CONTRACTOR shall secure, at the CONTRACTOR'S own expense, all personnel required to perform this Contract.

  • Service Location and Equipment The AGENCY must request in writing and said request must be approved in writing by the COUNTY’S Manager of the CCC or designee, prior to any change in the dates, times, and locations of services provided in this Contract.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • Personnel Requirements and Documentation Grantee will;

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • School Equipment The Association shall have the right to use audio-visual and/or duplicating equipment provided all costs incurred therewith are paid for by the Association. Association use of school equipment shall not interfere with school use. The building principal must approve any Association use that involves a cost.

  • Functional Requirements Applications must implement controls that protect against known vulnerabilities and threats, including Open Web Application Security Project (OWASP) Top 10 Risks and denial of service (DDOS) attacks.

Time is Money Join Law Insider Premium to draft better contracts faster.