Water and Sewer Infrastructure Sample Clauses

Water and Sewer Infrastructure. In consideration for the annexation of the Property, the Property Owner agrees that the City shall be the sole provider of water and sewer services within the Project. All water and sewer infrastructure shall be designed and constructed in conformance with all requirements of the Land Use Regulations and the laws, regulations, and rules of the South Carolina Department of Health and Environmental Control. The Property Owner shall design and construct all sewer infrastructure that will serve the entire Project or multiple Phases of the Project to accommodate wastewater flows at full build-out of the entire Project or such multiple Phases or the Project, as applicable. Fire department access and fire hydrants shall be provided in accordance with Section 156.053 of the Land Development Ordinance. The model fire hydrant shall be approved by the City’s Fire Chief prior to the installation of any water infrastructure (which approval shall not be unreasonably withheld, conditioned or delayed). The Property Owner shall be responsible for the installation of any sewer lift stations that may be required and initial backup generator for each lift station. The Property Owner shall pay all costs associated with the planning, engineering, construction, and installation of the Project’s water and sewer infrastructure.
AutoNDA by SimpleDocs
Water and Sewer Infrastructure. The Borough represents that it currently has sufficient sewer capacity and necessary easements to support the Project. The Borough represents that it currently has sufficient water capacity for the Project. Subject to Section 4.4 herein, to the best of the Borough’s knowledge there are no limits on availability of water or sewer capacity or restriction on the construction and operation of Water, Sewer and Stormwater Infrastructure Improvements that would impact service to the Project Area site to support the Project. The Borough covenants that it shall work with the Redeveloper to confirm the availability of water and sewer capacity with the providers of those services to the Borough.
Water and Sewer Infrastructure. It is currently anticipated that the 27 Albuquerque Bernalillo County Water Utility Authority (“Authority”) will provide water and 28 sewer service for the Project. Owner has prepared a conceptual Water Master Plan and a 29 conceptual Wastewater Master Plan, which are described in the Master Plan; however, such 30 master plans are subject to adjustment through the more detailed analysis to be conducted in 31 connection with Level B Plans and Level C Plans. If the Authority provides water and sewer 32 service for the Project, the Owner will enter into a separate development agreement with the 33 Authority concerning the terms of providing such water and sewer service to the Project. All 34 matters associated with water and sewer infrastructure for the Project shall be resolved solely 35 between Owner and the Authority. The County will not promote, support or enact any 36 ordinance, legislation or policy that interferes with and/or restricts the Owner’s use of the 37 Authority’s water and sewer infrastructure and/or agreements between the Owner and Authority, 38 as long as that use does not diminish or otherwise negatively affect current County water or 39 sewer service. 40
Water and Sewer Infrastructure. The Borough represents that it currently has sufficient sewer capacity and necessary easements to support Phase One and Phase Two of the Project. The Borough represents that it currently has sufficient water capacity for Phase One of the Project and may have sufficient water capacity for Phase Two of the Project. Subject to Section 4.4 herein, to the best of the Borough’s knowledge there are no limits on availability of water or sewer capacity or restriction on the expansion of water and sewer infrastructure that would impact service to the Redevelopment Area site to support the Project. The Borough covenants that it shall work with the Redeveloper to confirm the availability of water and sewer capacity with the providers of those services to the Borough.
Water and Sewer Infrastructure. This project addresses the development of a certified site for businesses that will locate in or relocate to the certified site within the city limits of Indianola, north of State Hwy 92 and east of 15th Street.

Related to Water and Sewer Infrastructure

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • Meter and Cabling Be obliged to draw electricity lines/wires, television cables, broadband data cables and telephone cables to the said Apartment only through the ducts and pipes provided therefor, ensuring that no inconvenience is caused to the Promoter or to other apartment owners. The main electricity meter shall be installed only at the space designated for common meters. The Allottee shall under no circumstances be entitled to affix, draw or string wires, cables, dish antennae or pipes from, to or through any part or portion of and outside walls of the building in which the Apartment is located save in the manner indicated by the Promoter/Association (upon formation).

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.