Voltage drop Sample Clauses

Voltage drop. After the electrification of villages under these projects, pumps for raising water from xxxxx and for supplying water to the houses were installed in the villages. However, in the field survey we found that both pumps had broken down and were inoperative. These pumps had already broken down and been repaired before. The apparent cause of the breakdowns in each case was motor burnout due to reduced voltage. The electricity supply situation there was that the water raising and supply pumps were situated 400m away from the distribution transformer, and most of the villagers' houses were connected to the low-voltage distribution line in that interval. In the records of the Udon Thani substation referred to earlier, the demand peak occurs at dinner time, between 6pm and 8pm. In this period, when demand is concentrated, the decline in voltage is greatest at the ends of distribution feeders. The motors also run automatically at such times, and this leads to the pump motors burning out, due to the principle explained below. Incidentally, there is a law prohibiting the use of agricultural pumps at night, so they are not used in the same peak period. The reason voltage drop causes motor burnout is that, due to the properties of motors, a 10%
Voltage drop. The voltage difference between the sending and receiving ends must not exceed 5% of the nominal capacity. In Scheme No. 1, at the end of this Annex, the general configuration of the project is described.
Voltage drop. 7.1.5.1 Contractor shall be responsible for calculating system voltage drop levels. The maximum system transient impedance or minimum available transient short-circuit capacity, shall be used in making voltage drop calculations relating to motor starting, restarting and/or re-acceleration requirements.

Related to Voltage drop

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Emergency Generator Although Landlord is the owner of emergency generator and related automatic transfer switches serving the Building and the 901 Building (collectively, the “Emergency Generator”), prior to the date of this First Amendment, Tenant, as the sole tenant of the Building and the 901 Building, has been operating and maintaining the Emergency Generator. Tenant shall, on the date that is 1 day after the mutual execution and delivery of this First Amendment by the parties (“EG Transfer Date”), (x) deliver the Emergency Generator to Landlord in good working order with a full tank of diesel (y) assign to, transfer and deliver to Landlord all governmental permits and licenses (to the extent such permits and licenses are assignable), if any, warranties (to the extent assignable), operating and maintenance manuals, records and other documents concerning the Emergency Generator, and (y) terminate any service, maintenance or other contracts maintained by Tenant with respect to the Emergency Generator. Tenant has not been obligated to maintain a wastewater permit in connection with the Emergency Generator. With respect to any permit required for the Emergency Generator, Landlord acknowledges and agrees that Tenant has been in the process of obtaining a generator permit in connection with a Tenant permitting process underway with the Bay Area Air Quality Management District (“BAAQMD”) for the 901 Building, that Tenant will remove the generator from its permit application with BAAQMD, and that Landlord will need to obtain a generator permit from BAAQMD in its own name. To the best of Tenant’s knowledge, Tenant does not have any other permits in connection with the Emergency Generator. To the extent Tenant has current contracts with any vendors for the Emergency Generator, Tenant and Landlord shall reasonably cooperate to assign or terminate such contracts in the manner set forth in Section 14 above regarding utilities. To the extent it is not possible for Tenant to remove the request for a generator permit from its BAAQMD application or to assign or terminate any service maintenance or other contracts within 1 day after the mutual execution and delivery of this First Amendment, Tenant shall not be in default hereunder if Tenant promptly commences efforts to do so and diligently performs until such actions have been completed within a reasonable period after such date. Landlord shall, within 5 days of the EG Transfer Date, as part of Expenses, conduct such testing of the Emergency Generator required, in Landlord’s sole and absolute discretion, to determine whether the Emergency Generator is, in fact, in good working order. If such testing discloses that the Emergency Generator is not in good working order, Landlord shall have the right, at Tenant’s sole cost and expense, to perform any maintenance and/or repairs required to put the Emergency Generator in good working order. Following the EG Transfer Date, Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the current capacity of the Emergency Generator and Tenant shall be entitled to Tenant’s share of the capacity thereof available for use by all tenants of the Building and the 901 Building, collectively, in accordance with the rentable area of the Premises and the 901 Building and the collective rentable areas of the Building and the 901 Building occupied by such other tenants, (ii) to contract with a third party to maintain the emergency generators (“Emergency Generator Servicer”) as per the manufacturer’s standard maintenance guidelines, and (iii) to obtain and maintain licenses for the emergency generators as required by applicable law. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the Emergency Generator Servicer or any other third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Landlord shall provide to Tenant copies of any reports received by Landlord from the Emergency Generator Servicer regarding its maintenance and repairs of the emergency generators; provided, however, that in no event shall Landlord’s failure to deliver such reports constitute a default by Landlord under the Lease. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed. Landlord shall provide Tenant with not less than five (5) business days’ notice of the scheduled disruption in the operation of the emergency generators. In the case of an emergency, Landlord shall provide Tenant with notice of any emergency disruption as soon as reasonably possible after Landlord becomes aware of the need for such emergency disruption.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Speed The relative importance we attach is “high”.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case.

Time is Money Join Law Insider Premium to draft better contracts faster.