Verification Testing Sample Clauses

Verification Testing a. Upon initial parallel operation of the Facility, or any time interface hardware or software is changed, a verification test of Seller-Owned Interconnection Facilities shall be performed by Seller. A qualified individual, hired or employed by the Seller, shall perform the verification testing in accordance with the manufacturer’s published test procedure. Qualified individuals include professional engineers, factory trained and certified technicians, and licensed electricians with experience in testing protective equipment.
AutoNDA by SimpleDocs
Verification Testing. UL Contracting Party will perform periodic retesting of Client’s products it has assessed and found to comply with the energy efficiency requirements as previously outlined in the Quotation to verify their ongoing compliance. On an annual basis, the review may include UL Contracting Party’s retesting of at least 5%, or as specified in the Program specific requirements, of Client’s models representing Client’s product(s) previously found to comply with the energy efficiency requirements by procuring those such products from customary retail distribution channels, or as specified in the Program specific requirements. The acquisition and testing of such samples will be at Client’s expense. UL Contracting Party reserves the right to revoke use of the UL Mark on products and remove listing from the UL Contracting Party’s Product Database if UL Contracting Party determines the product is not in compliance with the requirements as outlined on the Quotation covering the UL Contracting Party’s Service preformed. If Client makes changes to the product(s) that will take the product(s) out of compliance with the requirements outlined on the Quotation, Client must promptly notify UL Contracting Party and submit the product for a re-assessment. If changes are made that take the product out of compliance and UL Contracting Party is not notified, Client may be required to suspend use of the UL Mark, report and/or certificate and pay a penalty when these changes are discovered during the annual verification testing. Continued noncompliance of the product may result in complete withdrawal from the EEC Services program.
Verification Testing a. Upon initial parallel operation of the Generating Facility, or any time interface hardware or software is changed, a verification test shall be performed. A licensed professional engineer or otherwise qualified individual shall perform verification testing in accordance with the manufacturer’s published test procedure. Qualified individuals include professional engineers, factory trained and certified technicians, and licensed electricians with experience in testing protective equipment. The Company reserves the right to witness verification testing or require written certification that the testing was performed.
Verification Testing. The Contractor shall conduct verification testing of all bugs/tasks, via the CXXI issue tracking tool. Tier-1 testing shall include all appropriate unclassified general scenarios and shall include specific functional scenarios. Tier-2 testing shall include classified production/study base case scenarios that are provided by the integrator/study teams. Verification testing shall be initiated in a timely manner (i.e., within 48 hours after notification during normal duty hours) after the bugs/tasks issues are completely resolved. Part of the verification process shall be proper documentation of the procedures used to resolve all issues.
Verification Testing. For all Products or its parts specification, Manufacturer shall draft appropriate verification protocol and perform the testing in accordance with that protocol. IWT shall author the system verification protocol and IWT shall accomplish verification and validation of the Product (“Verification Testing”). Third party (independent qualified testing facility) testing, in addition to related test materials, as shall be approved in advance by IWT, shall be paid by IWT, and shall be an agent of IWT. Test materials shall be the exclusive property of IWT. IWT will collect and/or prepare for Manufacturer data including vibration, shock, temperature, etc. of the actual environment where the product will be used. IWT will also perform operation verification during and at the end of development, operation verification on the actual test drive (field test), life and durability test, and the final acceptance tests.
Verification Testing. The Grantor shall perform a verification test on the Products and Other Products manufactured in accordance with the Technology. If the verification test indicates that the manufacture of the Products or Other Products is in conformity with the technical specifications of the Technology, the verification test shall be considered to have been successfully completed. In the event that the verification is not successfully completed, the Grantor shall analyze the causes and take the necessary measures to eliminate the defects.
Verification Testing. Licensee must verify each Licensed Hard Core Implementation developed by Licensee pursuant to the license described in Section 2.1 or 2.3 of the Master Agreement on each process to be used for volume manufacture. For each such Licensed Hard Core Implementation developed pursuant to the rights granted in Section 2.1, Licensee shall run the latest architecture verification program (“AVP” or “Architecture Verification Program”) provided by MIPS under the applicable Technology Schedule, without any modification to the AVP, in accordance with the process set forth in either Section 2 or in Section 3 of this Exhibit B. For each such Licensed Hard Core Implementation developed pursuant to the rights granted in Section 2.3, Licensee shall run the latest verification test suite (“VTS” or “Verification Test Suite”) provided by MIPS under the applicable Technology Schedule, without any modification to the VTS, in accordance with the process set forth in either Section 2 or in Section 3 of this Exhibit B.
AutoNDA by SimpleDocs
Verification Testing. Consultant shall oversee all testing of component materials and completed work items to the extent that it assures that the materials and workmanship incorporated in the Project are in conformity with the plans, specifications, and construction contract provisions.
Verification Testing. 3.3.2.3.1 The Contractor shall support verification and validation testing of new systems and modifications to existing systems IAW plans and procedures including, but not limited to, factory acceptance testing, equipment receipt, system and modification integration, system and modification installation, System Operations Verification Testing (SOVT), and customer acceptance.
Verification Testing a. Upon initial parallel operation of the Generating Facility, or any time either (i) interface hardware or software is changed, or (ii) the Company observes that the Subscriber Organization is not in compliance with the operational and performance requirements specified in the Company’s Rule 14H, this Agreement and/or the SFC, a verification test shall be performed. Such verification test shall include testing of the telemetry and control interface which allows the Company to remotely measure, monitor, evaluate and verify technical compliance. Generating Facility performance, and power quality and, if necessary, control the Generating Facility. A licensed professional engineer or otherwise qualified individual shall perform verification testing in accordance with the manufacturer’s published test procedure. Qualified individuals include professional engineers, factory trained and certified technicians, and licensed electricians with experience in testing protective equipment. The Company reserves the right to witness verification testing or require written certification that the testing was performed.