Vehicle Testing and Commissioning Sample Clauses

Vehicle Testing and Commissioning. The goals of this task are to test and commission the two zero-emission H2BUG. The Recipient shall: • Perform commissioning and shake-down testing to verify that all systems operate as expected and meet performance requirements. • Conduct electrical and structural tests, to ensure the system is robust and durable. • Prepare and submit the H2BUG Commissioning Report that describes lessons learned and best practices from testing and commissioning. • Provide a CPR Report #2 for subtasks 3.1 and 3.2 and participate in a CPR Meeting per subtask 1.3. Products: • H2BUG Commissioning Report • CPR #2 Report TASK 4 DEMONSTRATION, DATA COLLECTION, AND ANALYSIS The goals of this task are to complete planning activities that are critical to demonstration success, conduct vehicle testing in accordance with the goals and objectives of the Agreement, and perform data analysis to be defined in the measurement and verification (M&V) Plan.
AutoNDA by SimpleDocs
Vehicle Testing and Commissioning. The goals of this subtask are to test and commission the HyFCTs. The Recipient shall: • Perform commissioning, functional verification, and shakedown testing to verify that all systems operate as expected and meet performance requirements. Address issues identified during the system shakedown and perform additional vehicle tuning as needed. • Perform end-of-line testing to validate the performance and reliability of the prototype vehicles through formal Design Verification Plan & Report (DVP&R) process. This includes checking the vehicles while stationary and moving under controlled conditions and performing at least 2,500 miles of on-road testing. Address issues identified during the end-of-line testing and perform additional vehicle tuning as needed. • Conduct electrical and structural tests, to ensure the system is robust and durable. Address issues identified during the electrical and structural testing and perform additional vehicle tuning as needed. • Install approved telematics data collection devices on the vehicles. • Prepare and submit the HyFCT Commissioning Report that includes but is not limited to: o Summary of commissioning, functional verification, and shakedown testing results. o Summary of end-of-line testing results. o Summary of electrical and structural test results. • Prepare a CPR Report #2 in accordance with Subtask 1.3. • Participate in CPR Meeting #2 Products: • HyFCT Commissioning Report (draft and final) • CPR Report #2

Related to Vehicle Testing and Commissioning

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "C", which is attached hereto and forms part of this Agreement.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Training and Education SECTION 1 – Law Enforcement Supervisors’ Training The state and the PBA recognize the importance of supervisor training programs to develop management skills in our law enforcement supervisors. The state will make a reasonable effort to continue existing training programs in law enforcement techniques and to develop new programs in performance review techniques, supervisory skills, and managerial techniques.