Vegetation Removal Sample Clauses

Vegetation Removal. A. Vegetation removal must be limited to the minimum necessary to accommodate approved shoreline development. Mitigation sequencing per regulation 6.3(3) must be applied unless specifically excluded by other shoreline provisions, so that the design and location of the structure or development minimizes short- and long-term vegetation removal. The City may require site plan alterations to achieve maximum vegetation retention.
AutoNDA by SimpleDocs
Vegetation Removal. 1. Crews shall remove all shrubs and vegetation unintentionally growing on channel slopes and access walkways.
Vegetation Removal removal of vegetation that directly reduces a facility’s capacity and/or endangers a facility, including overhanging branches or tree limbs.
Vegetation Removal. Disturbance or removal of vegetation shall be kept to the minimum necessary to complete project related activities.
Vegetation Removal. The Professional shall inspect all trees adjacent to transmission line easements and identify trees with limbs overhanging or growing into the line facilities. The inspection shall also identify trees capable of growing into the line safety zone or trees (such as those that are structurally dead, weak, or dying) that might fall onto the line in the future.
Vegetation Removal. The disturbance or removal of vegetation shall not exceed the minimum necessary to complete work. Precautions shall be taken to avoid other damage to vegetation by people or equipment. Except for trees on dam and levee embankments, any trees which must be cut shall be cut at ground level, leaving the root mass in place to maintain bank stability. Avoid impacts to active bird nests.
Vegetation Removal. Remove vegetation as follows:
AutoNDA by SimpleDocs
Vegetation Removal consists of random clearing, side trimming, herbicide applications and debris removal operations.
Vegetation Removal. A. Vegetation removal must be limited to the minimum necessary to accommodate approved shoreline development. The City may require site plan alterations to achieve maximum vegetation retention.
Vegetation Removal. Vegetation shall be placed on top of re-contoured - road segments and completed channel side slopes in stable positions not interfering with stream channel flow.
Time is Money Join Law Insider Premium to draft better contracts faster.